BIOSTRENGTH LINE: Service & Maintenance manual - rev. 2.1
Page 7.161
7.4.32. D
ISASSEMBLING THE PRIMARY SHAFT
Figure 7.4.32-1
Follow the steps described in paragraphs 7.4.28.
“Disassembling the weight stack frame guard”,
7.4.30. “Disassembling the bell” and 7.4.31.
“Disassembling the primary shaft - secondary
shaft chain”.
1. Unscrew the 4 screws
a
using a 17-gauge
wrench.
2. Remove the PRIMARY SHAFT.
To disassemble the components of the
PRIMARY SHAFT, place it on a bench or flat
surface. Then:
To disassemble the bearing
b
:
1. Unscrew the two dowels using a 2-gauge
hexagonal T-wrench.
2. Remove the bearing.
To disassemble the stop
c
:
1. Remove the bearing
b
.
2. Use a 4-gauge hexagonal T-wrench to
unscrew the dowel
d
.
3. Remove the stop.
To disassemble the pinion
e
:
1. Remove the bearing
b
, and the stop
c
.
2. Use a 4-gauge hexagonal T-wrench to
unscrew the dowel
f
.
3. Remove the pinion.
To disassemble the bearing
g
:
1. Remove the bearing
b
, the stop
c
, and the
pinion
e
.
2. Use a 3-gauge T-wrench to unscrew the 2
dowels
h
.
3. Remove the bearing.
Continued on next page
→
Summary of Contents for BIOSTRENGTH LINE
Page 1: ...SERVICE MAINTENANCE MANUAL REV 2 1...
Page 2: ......
Page 4: ......
Page 16: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page xii Page intentionally left blank...
Page 88: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 2 70 Page intentionally left blank...
Page 99: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 3 11 Figure 3 2 5...
Page 122: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 4 2 Page intentionally left blank...
Page 634: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 9 26 Page intentionally left blank...
Page 645: ......