![Technogym BIOSTRENGTH LINE Service Maintenance Manual Download Page 558](http://html1.mh-extra.com/html/technogym/biostrength-line/biostrength-line_service-maintenance-manual_1070169558.webp)
BIOSTRENGTH LINE: Service & Maintenance manual - rev. 2.1
Page 7.384
7.9.36. D
ISASSEMBLING THE SHOULDER REST GROUP RELEASE CABLE
Figure 7.9.36-1
1. Shut off the equipment and unplug the power
cord from the wall socket.
2. Unscrew the setting screw of the LEVER
RELEASE CABLE, using a 13-gauge
wrench on the counter-nut
a
and screw
b
.
3. Pull the cable from the release handle,
passing the blocking ball through the holes
provided.
Figure 7.9.36-2
4. Unscrew the 3 screws
c
, using a 2.5-gauge
hexagonal T-wrench.
5. Use a 3-gauge hexagonal T-wrench to
unscrew the dowel
d
.
Continued on next page
→
Summary of Contents for BIOSTRENGTH LINE
Page 1: ...SERVICE MAINTENANCE MANUAL REV 2 1...
Page 2: ......
Page 4: ......
Page 16: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page xii Page intentionally left blank...
Page 88: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 2 70 Page intentionally left blank...
Page 99: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 3 11 Figure 3 2 5...
Page 122: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 4 2 Page intentionally left blank...
Page 634: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 9 26 Page intentionally left blank...
Page 645: ......