![Technogym BIOSTRENGTH LINE Service Maintenance Manual Download Page 461](http://html1.mh-extra.com/html/technogym/biostrength-line/biostrength-line_service-maintenance-manual_1070169461.webp)
BIOSTRENGTH LINE: Service & Maintenance manual - rev. 2.1
Page 7.287
7.7.30. D
ISASSEMBLING THE PULLEYS
Figure 7.7.30-1
Follow the steps described in paragraph 7.7.17.
“Disassembling the upright guard”.
For type
A
pulleys:
1. Unscrew the screw
a
and the nut using 2 17-
gauge wrenches.
2. Remove the pulley.
For type
B
pulleys:
3. Unscrew the screw
b
using an 8-gauge
hexagonal T-wrench.
4. Remove the washer and cable lock.
5. Remove the pulley.
To reassemble the PULLEYS, follow the above
steps in reverse order.
Summary of Contents for BIOSTRENGTH LINE
Page 1: ...SERVICE MAINTENANCE MANUAL REV 2 1...
Page 2: ......
Page 4: ......
Page 16: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page xii Page intentionally left blank...
Page 88: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 2 70 Page intentionally left blank...
Page 99: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 3 11 Figure 3 2 5...
Page 122: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 4 2 Page intentionally left blank...
Page 634: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 9 26 Page intentionally left blank...
Page 645: ......