![Technogym BIOSTRENGTH LINE Service Maintenance Manual Download Page 566](http://html1.mh-extra.com/html/technogym/biostrength-line/biostrength-line_service-maintenance-manual_1070169566.webp)
BIOSTRENGTH LINE: Service & Maintenance manual - rev. 2.1
Page 7.392
7.9.42. D
ISASSEMBLING THE LEVER CABLE
Figure 7.9.42-1
Follow the steps described in paragraphs 7.9.38.
“Disassembling the tachogenerator guard” and
7.9.39. “Disassembling the front guard”.
For each side:
1. Unscrew the 3 dowels
a
, using a 4-gauge
hexagonal T-wrench.
2. Remove the cable with the aid of a pair of
pliers.
3. Remove the cable from the pulleys.
To unscrew the joints:
4. Unscrew the screw
b
, holding the nut
c
in
place with 2 17-gauge wrenches.
5. Remove the joints.
To reassemble the LEVER CABLE, follow the
above steps in reverse order.
When the operation is complete, adjust
the LEVER CABLE tension as
described in paragraph 8.6. .
Summary of Contents for BIOSTRENGTH LINE
Page 1: ...SERVICE MAINTENANCE MANUAL REV 2 1...
Page 2: ......
Page 4: ......
Page 16: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page xii Page intentionally left blank...
Page 88: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 2 70 Page intentionally left blank...
Page 99: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 3 11 Figure 3 2 5...
Page 122: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 4 2 Page intentionally left blank...
Page 634: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 9 26 Page intentionally left blank...
Page 645: ......