
558
Figures 15.10 and 15.11 show examples of conversion start operation timing.
ADDRB
ADDRA
Channel 0
Channel 1
Channel 2
Channel 3
ADST
ADF
ADDRD
ADDRC
Set to 1 by software
Analog circuit
power supply
200 cycles
Set
Clear
Sam-
pling
1
Sam-
pling
2
Sam-
pling
3
A/D
conver-
sion 1
A/D
conver-
sion 2
A/D
conver-
sion 3
Conver-
sion
standby
Conver-
sion
standby
Conver-
sion
standby
Conver-
sion
standby
Cleared to 0 by software
Conversion
result 1
Conversion
result 2
Conversion
result 3
Figure 15.10 Conversion Start Operation (Low-Power Conversion Mode)
Summary of Contents for SH7041 Series
Page 2: ......
Page 6: ......
Page 38: ...xvi ...
Page 44: ...6 ...
Page 46: ...8 ...
Page 48: ...10 ...
Page 82: ...44 ...
Page 114: ...76 ...
Page 118: ...80 ...
Page 124: ...86 ...
Page 170: ...132 ...
Page 250: ...212 ...
Page 492: ...454 ...
Page 506: ...468 ...
Page 604: ...566 ...
Page 684: ...646 ...
Page 706: ...668 ...
Page 778: ...740 ...
Page 780: ...742 ...
Page 818: ...780 ...
Page 850: ...812 ...
Page 923: ...SH7040 SH7041 SH7042 SH7043 SH7044 SH7045 Group Hardware Manual REJ09B0044 0600O ...