Replace the ESM Extension Cable
Push it straight down into position..
7.
Attach the ESM connector to the ESM extension cable [2].
8.
.
9.
Prepare the server for operation. See
.
Replace the ESM Extension Cable
1.
Prepare the server for cold service.
This is a cold-service component. Power down the system and disconnect the AC power cables
from the server before performing this procedure.
See
“Preparing the Server for Component Replacement” on page 101
2.
.
3.
Rotate the SMOD 180 degrees so the back (connector) side is facing toward you.
208
Oracle Server X7-8 Service Manual • October 2017
Summary of Contents for X7-8
Page 1: ...Oracle Server X7 8 Service Manual Part No E71936 01 October 2017 ...
Page 2: ......
Page 13: ...Contents Index 303 13 ...
Page 14: ...14 Oracle Server X7 8 Service Manual October 2017 ...
Page 16: ...16 Oracle Server X7 8 Service Manual October 2017 ...
Page 46: ...46 Oracle Server X7 8 Service Manual October 2017 ...
Page 268: ...268 Oracle Server X7 8 Service Manual October 2017 ...
Page 294: ...294 Oracle Server X7 8 Service Manual October 2017 ...