13 - 48
Chapter 13 Control Sub Functions
(2) The following shows the speed change time chart.
Cd. 15 Speed change request
Cd. 14 New speed value
In speed change
processing flag
BUSY signal
V
t
1
0
0
1
0
2000
0
Dwell time
PLC READY signal
Positioning start signal
[Y10]
[Y0]
READY signal
[X0]
[X10]
Md. 40
All axis servo ON
[Y1]
Error detection signal
( Md. 31 Status: b13)
Start complete signal
( Md. 31 Status: b14)
Positioning complete signal
( Md. 31 Status: b15)
Fig. 13.26 Time chart for changing the speed from the PLC CPU
(3) Add the following sequence program to the control program, and write it to
the PLC CPU.
No.14 Speed change program
<Pulsate speed change command>
<Hold speed change command>
<Set speed change value
(90.00mm/min)>
<Set speed change request>
M11
PLS
M12
SET
M11
PLS
K9000
DMOVP
D11
M11
PLS
K3600000
DMOVP
D11
<Write speed change>
TOP
H0
K4314
D11
K3
<Turn OFF speed change request
memory>
M12
RST
U0\
G4316
=
K0
954
960
963
X32
M11
X10
M12
[Program example]
M11
PLS
K1
MOVP
D13
X4D
<Speed change value
(3600.000deg/min)>
Summary of Contents for MELSEC Q Series
Page 2: ......
Page 30: ...A 28 MEMO ...
Page 32: ...MEMO ...
Page 97: ...3 29 Chapter 3 Specifications and Functions MEMO ...
Page 102: ...3 34 Chapter 3 Specifications and Functions MEMO ...
Page 282: ...5 162 Chapter 5 Data Used for Positioning Control MEMO ...
Page 374: ...7 16 Chapter 7 Memory Configuration and Data Process MEMO ...
Page 376: ...MEMO ...
Page 400: ...8 24 Chapter 8 HPR Control MEMO ...
Page 425: ...9 25 Chapter 9 Major Positioning Control MEMO ...
Page 528: ...9 128 Chapter 9 Major Positioning Control MEMO ...
Page 554: ...10 26 Chapter 10 High Level Positioning Control MEMO ...
Page 586: ...11 32 Chapter 11 Manual Control MEMO ...
Page 800: ...16 54 Chapter 16 Troubleshooting MEMO ...
Page 830: ...Appendix 30 Appendices MEMO ...
Page 833: ......