CRU
0
DVI
24V 1.5A max
POWER OUT
PTP1
PTP2
CAL
M/S
I/O
1 MW 250Vpk
1 MW 250Vpk
1
2
3
4
5
6
7
8
1 MW 250Vpk
1
3
4
5
6
7
8
1
2
3
4
5
6
7
8
1 MW 250Vpk
1 MW 250Vpk
1
2
3
4
5
6
7
8
1 MW 250Vpk
1
3
4
5
6
7
8
1
2
3
4
5
6
7
8
1 MW 250Vpk
1
MW 2
50
Vpk
1
MW 2
50
Vpk
1
2
3
4
5
6
7
8
1
MW 2
50
Vpk
1
3
4
5
6
7
8
1
2
3
4
5
6
7
8
Satellite
GPS receiver 1
GPS receiver 2
GPS signal
GEN series system 1
GEN series system 2
Figure 14.7:
Typical GPS absolute time of day setup
14.5.4
Start/Stop synchronization
When using multiple mainframes in continuous mode, expectations are typically
that the first sample of each channel aligns. However, depending on how the
start and stop actions are synchronized, this might not be the reality. The
response time within GEN series systems is not specified, e.g. the time from
when the Start button has been pressed to when the mainframe actually
captures the first sample. The response time varies and is dependent on a
number of parameters, e.g. the number of acquisition cards within the
mainframe and the the speed of the Windows PC. Given this variation in
response, a system start should be executed in time to guarantee the recording
of all important data.
GEN3i
334
I3763-3.1 en HBM: public