1.2 System Configuration
127
Control Devices
Caution for wiring of BEV unit system with Central Remote Controller
When the BEV unit system, such as FXAQ/FXLQ-M(A)V1, FXUQ-M(A)V1, and FUYP-BV1 are connected to the Central
Remote Controller.
Please take care as follows when wiring.
F1, F2
[BEV]
F1, F2
[BEV]
F1, F2
[Interface ADP
for SkyAir]
[Wiring Example (1)]
[Wiring Example (2)]
[NG Example]
(NOTE)
[Central
R/C]
F1, F2
[BEV]
F1, F2
[BEV]
F1, F2
[BEV]
F1, F2
[BEV]
F1, F2
[BEV]
F1, F2
[BEV]
F1, F2
[BEV]
F1, F2
[Interface ADP
for SkyAir]
F1, F2
[Interface ADP
for SkyAir]
F1, F2
[Interface ADP
for SkyAir]
F1, F2
[Interface ADP
for SkyAir]
F1, F2
[Interface ADP
for SkyAir]
F1, F2
[Interface ADP
for SkyAir]
F1, F2
[Interface ADP
for SkyAir]
F1, F2
[Interface ADP
for SkyAir]
[Indoor unit]
[Indoor unit]
[Indoor unit]
[Indoor unit]
[Indoor unit]
[Indoor unit]
(NOTES)
1. When 3 or more wirings are branched from the
same terminal block, use a relaying terminal
block of field supply.
2. In the Wiring Example (1) and (2), 3 wires are
not connected on the same terminal block.
3. Address setting is required for only indoor
units (ADP connection) when BEV units are
controlled by Central Remote Controller.
Therefore, BEV connected indoor units are
controlled under the number of indoor units
like standard indoor unit.
(BEV is not counted as an indoor unit.)
With respect to the limitation to the number
of units connected, please count it as the
number of indoor units.
[Central
R/C]
[Central
R/C]
[Indoor unit]
[Indoor unit]
[Indoor unit]
Summary of Contents for D-BACS
Page 1: ...ED 72 721 Preliminary Daikin Buildings Air conditioning Control System D BACS DESIGN GUIDE ...
Page 17: ...xvi 1 5 Open Network Glossary Introduction ...
Page 41: ...24 Outline of D BACS System ...
Page 74: ...57 Remote Controllers HRV Wired remote controller BRC301B61 VAM ...
Page 107: ...90 5 4 HRV BRC301B61 Remote Controllers ...
Page 142: ...1 2 System Configuration 125 Control Devices 1 2 System Configuration System Outline ...
Page 181: ...164 3 8 Error Diagnosing Function Control Devices ...
Page 215: ...198 3 8 Wiring Example intelligent Manager ...
Page 235: ...218 Interface for Use in BACnet ...
Page 253: ...236 Interface for use in LONWORKS 10 Reference Materials Error Code Conversion Table ...
Page 268: ...251 Interface for use in LONWORKS 13 Workflow ...
Page 285: ...268 1 6 Notes Power Proportional Distribution P P D ...