
4.2 Applicable Models
229
Interface for use in LONWORKS
®
4.2
Applicable Models
∗
1 Engineered & Industrial Systems Div. prohibits a connection between the fan unit and intelligent Touch Controllers (and other central
operation equipment).
∗
2 For
∆
parts, consult with Engineered & Industrial Systems Div.
Function Names
VRV
Sky Air
HRV
Outdoor Air
Processing Unit
FXYM-KF, MF
Wiring Adaptor for
Other Air
Conditioner
Central
Control
Adaptor Kit
Fan Coil
Controller
∗
15
Fan
Unit
∗
14
∗
15
Co
ntrolling Items
ON/OFF Command
{
{
{
{
{
{
{
{
Operation Mode Setting
{
{
×
{
×
{
{
×
Temperature Setting
{
{
×
× (Not settable by
remote controller)
×
{
{
×
Airflow Rate Setting
{
{
×
×
×
×
∆
(Only Quick/
Soft)
×
Filter Sign Reset
{
{
{
{
×
×
{
×
Forced Thermostat OFF Setting
{
{
×
{
×
×
×
×
Remote ON/OFF Control Rejection
{
{
{
{
×
{
{
{
Remote Operation Mode Control
Rejection
{
{
×
{
×
{
{
×
Remote Temperature Setting Control
Rejection
{
{
×
{
×
{
{
×
System Forced OFF Setting
{
{
{
{
{
{
{
{
Sub Group Address Control Rejection
Setting
∗
This is a controlling item for subsidiary central operation equipment.
Mon
itoring I
tems
ON/OFF Status Report
{
{
{
{
{
{
{
{
Operation Mode Status Report
{
{
×
{
×
{
{
×
Temperature Setting Report
{
{
×
×
×
{
{
×
Room Temperature Report
{
{
×
{
(Temperature at
the blow-off outlet)
×
{
∆
(Only
thermostat for
sucking into
body)
×
Airflow Rate Setting Report
{
{
×
× (First speed fixed)
×
×
∆
(Only Low/
High)
{
Filter Sign Report
{
{
{
{
×
×
{
×
Error Status Report
{
{
{
{
{
{
{
×
Error Code Report
{
{
{
{
×
{
{
{
Thermostat Status Report
{
{
×
{
×
×
×
×
Forced Thermostat OFF Setting Status
Report
{
{
×
{
×
×
×
×
Remote ON/OFF Operation Rejection
Report
{
{
{
{
×
{
{
{
Remote Control Operation Mode
Setting Rejection Report
{
{
×
{
×
{
{
×
Remote Control Temperature Setting
Operation Rejection Report
{
{
×
{
×
{
{
×
System Forced OFF Setting Report
{
{
{
{
{
{
{
{
Sub Group Address Control Operation
Rejection Setting Report
∗
This is a sub group address controlled central operation equipment.
A/C Communication Status Report
{
{
{
{
{
{
{
{
Summary of Contents for D-BACS
Page 1: ...ED 72 721 Preliminary Daikin Buildings Air conditioning Control System D BACS DESIGN GUIDE ...
Page 17: ...xvi 1 5 Open Network Glossary Introduction ...
Page 41: ...24 Outline of D BACS System ...
Page 74: ...57 Remote Controllers HRV Wired remote controller BRC301B61 VAM ...
Page 107: ...90 5 4 HRV BRC301B61 Remote Controllers ...
Page 142: ...1 2 System Configuration 125 Control Devices 1 2 System Configuration System Outline ...
Page 181: ...164 3 8 Error Diagnosing Function Control Devices ...
Page 215: ...198 3 8 Wiring Example intelligent Manager ...
Page 235: ...218 Interface for Use in BACnet ...
Page 253: ...236 Interface for use in LONWORKS 10 Reference Materials Error Code Conversion Table ...
Page 268: ...251 Interface for use in LONWORKS 13 Workflow ...
Page 285: ...268 1 6 Notes Power Proportional Distribution P P D ...