v
1-5
Components .................................................................. 202
1-6
Dimensions.................................................................... 202
1-7
BACnet Object List ........................................................ 204
1-8
Names and Functions of each Part ............................... 205
1-9
Electric Wiring ............................................................... 207
1-10 Functions....................................................................... 212
1-11 Backup Systems for Troubles ....................................... 214
1-12 BMS (Building Management System) ........................... 216
1-13 Adopting “Super Wiring System” ................................... 216
2.
Daikin's Interface for
Use in BACnet
®
Agreement ........................................ 217
3.
Wiring Example ............................................................ 219
3-1
Interface for Use in BACnet
®
(DMS502B51)................. 219
3-2
Interface for Use in BACnet
®
(DMS
Optional Dlll Board (DAM411B51)................................. 220
3-3
Interface for Use in BACnet
®
(DMS502B51) with
P.P.D. Application Using Optional Di Board
(DAM412 B51)............................................................... 221
Part 8 Interface for use in LONWORKS
®
........... 223
1.
Introduction .................................................................. 225
2.
System Configuration .................................................. 226
3.
Part Names and Functions .......................................... 227
4.
Function ........................................................................ 228
4-1
Overview of Functions ................................................... 228
4-2
Applicable Models ......................................................... 229
5.
Specifications of Devices ............................................ 230
6.
Hardware ....................................................................... 231
6-1
Physical Appearance and Branch Connection .............. 231
6-2
Definition of LED and Switch ......................................... 231
7.
Object Details ............................................................... 232
7-1
Node Objects................................................................. 232
7-2
DIII-NET Common Objects............................................ 232
7-3
Air Conditioner Objects ................................................. 233
8.
Precautions Regarding XIF Files ................................ 234
8-1
File Name ...................................................................... 234
8-2
Limitations with Version 3.............................................. 234
8-3
Unused Network Variables............................................ 234
9.
Notes for when Commissioning ................................. 235
9-1
Suspension of Message Transmission when
Receiving Set Node Mode Online ................................. 235
10. Reference Materials
(Error Code Conversion Table) ................................... 236
11. Electric Wiring .............................................................. 237
11-1 Electric Wiring Connection ............................................ 237
11-2 Wiring Example ............................................................. 238
Summary of Contents for D-BACS
Page 1: ...ED 72 721 Preliminary Daikin Buildings Air conditioning Control System D BACS DESIGN GUIDE ...
Page 17: ...xvi 1 5 Open Network Glossary Introduction ...
Page 41: ...24 Outline of D BACS System ...
Page 74: ...57 Remote Controllers HRV Wired remote controller BRC301B61 VAM ...
Page 107: ...90 5 4 HRV BRC301B61 Remote Controllers ...
Page 142: ...1 2 System Configuration 125 Control Devices 1 2 System Configuration System Outline ...
Page 181: ...164 3 8 Error Diagnosing Function Control Devices ...
Page 215: ...198 3 8 Wiring Example intelligent Manager ...
Page 235: ...218 Interface for Use in BACnet ...
Page 253: ...236 Interface for use in LONWORKS 10 Reference Materials Error Code Conversion Table ...
Page 268: ...251 Interface for use in LONWORKS 13 Workflow ...
Page 285: ...268 1 6 Notes Power Proportional Distribution P P D ...