vi
12. Control-related Design Keypoints .............................. 239
12-1 Introduction.................................................................... 239
12-2 System Configuration .................................................... 239
12-3 Hardware ....................................................................... 241
12-4 Outline of Functions ...................................................... 242
12-5 LON Communication Specifications .............................. 247
12-6 Monitoring and Control Restrictions .............................. 249
13. Workflow ....................................................................... 251
14. Check Sheet for Control and Monitoring Items ......... 252
Part 9 Power Proportional Distribution
(P.P.D.) ..................................................... 255
1.
P.P.D. Design Guide..................................................... 256
1-1
System Architecture ...................................................... 256
1-2
Design Precautions ....................................................... 257
1-3
Connection other than VRV........................................... 260
1-4
Conditions and Method to Exclude Calculation for
Specified Indoor Unit ..................................................... 261
1-5
Explanations of Power Proportional Distribution ........... 262
1-6
Notes ............................................................................. 267
2.
intelligent Touch Controller (DCS601C51) with
the Software for P.P.D. Application (DCS002C51)
Including PCMCIA ........................................................ 269
3.
intelligent Touch Controller (DCS601C51) with
the Software for P.P.D. Application (DCS002C51)
Including PCMCIA Card and with the Software for
WEB Usage (DCS004A51)............................................ 270
4.
intelligent Manager III (DAM602B51) with
P.P.D. Application ........................................................ 271
5.
Interface for Use in BACnet
®
(DMS502B51) with
P.P.D. Application Using Optional Di Board
(DAM412 B51) ............................................................... 272
Part 10Adaptor .................................................... 273
1.
Adaptor for System ...................................................... 274
1-1
<DCS302A52> Unification Adaptor for
Computerized Control ................................................... 274
1-2
<KRP2A61 / KRP2A62 / KRP2A53>
Wiring Adaptor for Electrical Appendices (1)................. 277
1-3
<DTA104A61 / DTA104A62 / DTA104A53>
External Control Adaptor for Outdoor Unit
(Must be Installed on Indoor Units) ............................... 287
1-4
<DTA109A51> DIII-NET Expander Adaptor.................. 295
1-5
Dio Unit (DEC102A51) .................................................. 299
1-6
Di Unit (DEC101A51) .................................................... 311
1-7
Ai Unit (DAM101A51) .................................................... 320
Summary of Contents for D-BACS
Page 1: ...ED 72 721 Preliminary Daikin Buildings Air conditioning Control System D BACS DESIGN GUIDE ...
Page 17: ...xvi 1 5 Open Network Glossary Introduction ...
Page 41: ...24 Outline of D BACS System ...
Page 74: ...57 Remote Controllers HRV Wired remote controller BRC301B61 VAM ...
Page 107: ...90 5 4 HRV BRC301B61 Remote Controllers ...
Page 142: ...1 2 System Configuration 125 Control Devices 1 2 System Configuration System Outline ...
Page 181: ...164 3 8 Error Diagnosing Function Control Devices ...
Page 215: ...198 3 8 Wiring Example intelligent Manager ...
Page 235: ...218 Interface for Use in BACnet ...
Page 253: ...236 Interface for use in LONWORKS 10 Reference Materials Error Code Conversion Table ...
Page 268: ...251 Interface for use in LONWORKS 13 Workflow ...
Page 285: ...268 1 6 Notes Power Proportional Distribution P P D ...