
25
Part 2
Fundamental of DIII-NET
1. Design of DIII-NET ............................................... 26
1-1
Features of DIII-NET ....................................................... 26
2. DIII-NET Design Standard ................................... 27
2-1
Terminal Number ............................................................ 27
2-2
Detail of Outdoor Unit Terminal No. ................................ 27
2-3
Connection Method ......................................................... 28
3. Wiring Length ...................................................... 34
4. Unit and Group .................................................... 35
5. Number of Connectable Units ............................ 36
5-1
Number of Connectable Units ......................................... 36
5-2
Flow Chart to Determined the Number of
Units to Connected.......................................................... 37
5-3
Number of Units to be Connected [VRV]
(Supplementary Explanation) .......................................... 38
5-4
Connection of Devices other than VRV........................... 39
6. Group and Zone................................................... 40
6-1
Definition ......................................................................... 40
6-2
Patterns of Group and Zone............................................ 40
6-3
Group Address Number .................................................. 41
6-4
Setting Group No. for Centralized Control ...................... 42
6-5
Zone Address Number .................................................... 47
7. Wiring Specifications of DIII-NET ...................... 48
8. Combination of Multiple Central Remote
Controllers <DCS302CA61 • DCS301BA61 •
DST301BA61> ...................................................... 49
8-1
Check for Centralized Control Devices in
Simultaneous Use ........................................................... 49
8-2
Combination of intelligent Touch Controller and
Central Remote Controller .............................................. 51
8-3
Combination of
DCS302CA61·DCS301BA61·DST301BA61 ................... 52
8-4
Sequential Start............................................................... 54
8-5
Under Central Control ..................................................... 54
8-6
Error Code on Intial Setting and Wiring Troubles............ 54
Summary of Contents for D-BACS
Page 1: ...ED 72 721 Preliminary Daikin Buildings Air conditioning Control System D BACS DESIGN GUIDE ...
Page 17: ...xvi 1 5 Open Network Glossary Introduction ...
Page 41: ...24 Outline of D BACS System ...
Page 74: ...57 Remote Controllers HRV Wired remote controller BRC301B61 VAM ...
Page 107: ...90 5 4 HRV BRC301B61 Remote Controllers ...
Page 142: ...1 2 System Configuration 125 Control Devices 1 2 System Configuration System Outline ...
Page 181: ...164 3 8 Error Diagnosing Function Control Devices ...
Page 215: ...198 3 8 Wiring Example intelligent Manager ...
Page 235: ...218 Interface for Use in BACnet ...
Page 253: ...236 Interface for use in LONWORKS 10 Reference Materials Error Code Conversion Table ...
Page 268: ...251 Interface for use in LONWORKS 13 Workflow ...
Page 285: ...268 1 6 Notes Power Proportional Distribution P P D ...