1.5 Dio Unit (DEC102A51)
307
Adaptor
1.5.4 Electric Wiring Work and Initial Setting
1. Electric Wiring Work
2. Initial setting
z
DEC102A51 Switch Settings
Note:
1. All are set to "OFF" upon shipment from factory.
2. *1 If operating feedback input is not detected within 10 seconds after 1 operation input is received, it results in start/
stop failure.
Name
Operation
OFF
ON
SS1
Output switching
Switching control output
Always output
"1"
Always output
“2”
DS2
Abnormal input detection Open/Close
Failure detection
Open: Close (Normal)
→
Open (Abnormal)
Close: Open (Normal)
→
Close (Abnormal)
Open
Close
DS3
Buzzer output ON/OFF
ON/OFF switching of buzzer output of
buzzer unit upon detection of failure.
ON
OFF
DS4-1
Instantaneous automatic recovery
Recover control output after power failure
to status before the power failure.
No
Yes
DS4-2
Transmission failure
Shut off control output upon detecting
transfer failure.
Yes
No
DS4-3
Later operation priority
Allowing start/stop control from facility.
Yes
No
DS4-4
Start/stop failure
Detecting start/stop failure. (*1)
No
Yes
DS5
Abnormal output shutoff/retain
Shut off control output upon detecting
failure.
Yes
No
DS6-1
Startup failure
Masking time after detecting operation
input.
10 seconds
30 seconds
DS6-2
Failure detection
Operation upon recovery from failure.
Automatic
reset
Retained
DS6-3
Monitor input
Detecting failure under halting status.
Yes
No
DS6-4
Forced termination
Ignoring forced stop signal.
No
Yes
1
7
6
3
2
5
ON
4
8
1
7
6
3
2
5
4
1
3
2
4
8
ON
ON
DS6
Ins.
SS1
Con.
Contactor
DS5
DS4
RS1 Low
DS1 High
Group No. Set
0
DS2
DS3
D4
D2
D3
D1
CD
Aiarm
Monitor
(RED)
Operation
Monitor
(GRN)
H11P H12P
2
H3P
1
H10P
3
H9P
4
INPUT
H2P
H4P
H1P
M4
A1
M3
A3
CA
M2
A2
M1
A4
CM
L
N
F1
F2
X4M
TNc4
TNa2
AC200V
~240V
TNb3
TNc1
X1M
X3M
LED10
RED
TNc3
TNa1
TNb4
TNb2
HAP
HAP
GRN
TNc2
TP1
H10P
X2M
TNa4
TNa3
TNb1
X2A
X1A
YE
RED
1
2
3
4
No simultaneous clamping is allowed for high-voltage wiring
<power supply wiring (L/N), earth wiring, relay output wiring
(CD, D1 to 4)>, low-voltage wiring <communication wiring (F1/F2),
operation input wiring (CM, M1 to 4) and abnormal input wiring
(CA, A1 to 4)> since malfunctioning may result.
Also, in case where the wirings described above are routed in parallel,
be sure to connect the wirings at least 50mm apart from the other.
To 1~200-240V and earth
To facility equipment
To facility equipment
To terminals F1, F2 of the centralized control equipment or terminals
F1, F2 of other equipment
(outdoor unit, DEC101A51, 102A51)
Summary of Contents for D-BACS
Page 1: ...ED 72 721 Preliminary Daikin Buildings Air conditioning Control System D BACS DESIGN GUIDE ...
Page 17: ...xvi 1 5 Open Network Glossary Introduction ...
Page 41: ...24 Outline of D BACS System ...
Page 74: ...57 Remote Controllers HRV Wired remote controller BRC301B61 VAM ...
Page 107: ...90 5 4 HRV BRC301B61 Remote Controllers ...
Page 142: ...1 2 System Configuration 125 Control Devices 1 2 System Configuration System Outline ...
Page 181: ...164 3 8 Error Diagnosing Function Control Devices ...
Page 215: ...198 3 8 Wiring Example intelligent Manager ...
Page 235: ...218 Interface for Use in BACnet ...
Page 253: ...236 Interface for use in LONWORKS 10 Reference Materials Error Code Conversion Table ...
Page 268: ...251 Interface for use in LONWORKS 13 Workflow ...
Page 285: ...268 1 6 Notes Power Proportional Distribution P P D ...