2.4 Allocation of Centralized Address
181
intelligent Manager
2.4
Allocation of Centralized Address
(1) Allocate a centralized address and a name to each indoor unit.
(2) Specify the port number of iPU.
2-04
4F RoomA
2-05
4F RoomB
2-06
4F RoomC
2-07
4F RoomD
2-08
4F RoomE
2-00
3F RoomA
2-01
3F RoomB
2-02
3F RoomC
2-03
3F RoomD
1-07
2F RoomD
1-04
2F RoomA
1-05
2F RoomB
1-06
2F RoomC
1-03
1F RoomD
1-00
1F RoomA
1-01
1F RoomB
1-02
1F RoomC
2-04
4F RoomA
2-05
4F RoomB
2-06
4F RoomC
2-07
4F RoomD
2-08
4F RoomE
2-00
3F RoomA
2-01
3F RoomB
2-02
3F RoomC
2-03
3F RoomD
1-07
2F RoomD
1-04
2F RoomA
1-05
2F RoomB
1-06
2F RoomC
1-03
1F RoomD
1-00
1F RoomA
1-01
1F RoomB
1-02
1F RoomC
Port 1
Summary of Contents for D-BACS
Page 1: ...ED 72 721 Preliminary Daikin Buildings Air conditioning Control System D BACS DESIGN GUIDE ...
Page 17: ...xvi 1 5 Open Network Glossary Introduction ...
Page 41: ...24 Outline of D BACS System ...
Page 74: ...57 Remote Controllers HRV Wired remote controller BRC301B61 VAM ...
Page 107: ...90 5 4 HRV BRC301B61 Remote Controllers ...
Page 142: ...1 2 System Configuration 125 Control Devices 1 2 System Configuration System Outline ...
Page 181: ...164 3 8 Error Diagnosing Function Control Devices ...
Page 215: ...198 3 8 Wiring Example intelligent Manager ...
Page 235: ...218 Interface for Use in BACnet ...
Page 253: ...236 Interface for use in LONWORKS 10 Reference Materials Error Code Conversion Table ...
Page 268: ...251 Interface for use in LONWORKS 13 Workflow ...
Page 285: ...268 1 6 Notes Power Proportional Distribution P P D ...