
300
1.5 Dio Unit (DEC102A51)
Adaptor
K1R
1~200-240V
DEC102A51
CD
D1~4
(Terminal size: M3.5)
K1R
Facility Equipment Operation Circuit Example
Stop
command
D2
CD
D1
DEC102A51
DEC102A51
D4
CD
D3
K4R
1~200-240V
K3R
LOCAL
K3R
Local
stop
Local
operation
K5R
Local
operation
K2R
Output wiring for facility equipment 1
REMOTE
Facility Equipment Operation Circuit Example
K5R
K1R
Facility equipment
protecting device
Facility
equipment
protecting
device
Q1M
S1S
Q1M
S3S
S2S
1~200-240V
Q1M
Local
stop
Operation
command
Stop
command
Operation
command
REMOTE
S2S
Q1M
K2R
Maximum Current
1.5A (Resistive Load)
2A (Resistive Load)
Minimum Current
10mA
10mA
Voltage SPEC
200-240V
DC5~24V
Output SPEC: No-voltage "a" contact
K5R
Output wiring for facility equipment 2
LOCAL
K1R
Facility equipment
protecting device
K5R
K4R
Operation
command
S1S
K5R
S3S
(Terminal size: M3.5)
(Terminal size: M3.5)
K2R
K1R
1~200-240V
1~200-240V
Facility
equipment
protecting
device
Operation output
It is possible to select continuous 1 output (4 points) or instantaneous 2 output (ON/OFF pair-2 points).
For switching, refer to 2. Initial Setting
•
Wiring at Continuous Output (Up to 4 facility equipments can be connected.)
•
Wiring at Instantaneous Output (Up to 2 facility equipments can be connected.)
Summary of Contents for D-BACS
Page 1: ...ED 72 721 Preliminary Daikin Buildings Air conditioning Control System D BACS DESIGN GUIDE ...
Page 17: ...xvi 1 5 Open Network Glossary Introduction ...
Page 41: ...24 Outline of D BACS System ...
Page 74: ...57 Remote Controllers HRV Wired remote controller BRC301B61 VAM ...
Page 107: ...90 5 4 HRV BRC301B61 Remote Controllers ...
Page 142: ...1 2 System Configuration 125 Control Devices 1 2 System Configuration System Outline ...
Page 181: ...164 3 8 Error Diagnosing Function Control Devices ...
Page 215: ...198 3 8 Wiring Example intelligent Manager ...
Page 235: ...218 Interface for Use in BACnet ...
Page 253: ...236 Interface for use in LONWORKS 10 Reference Materials Error Code Conversion Table ...
Page 268: ...251 Interface for use in LONWORKS 13 Workflow ...
Page 285: ...268 1 6 Notes Power Proportional Distribution P P D ...