11.1 Electric Wiring Connection
237
Interface for use in LONWORKS
®
11. Electric Wiring
11.1
Electric Wiring Connection
1P111315
z
Use a round crimp terminal with reinforcing sleeve for safety wiring connection to the DMS-IF
except the terminal for LONWORKS
®
Network.
SERVICE
ALIVE/WINK
SERVICE SWITCH
10A
Forced OFF
Outdoor uinit
DAIKIN
Earth leakage breaker
Power supply wiring 2.0mm
2
Implement the grounding in
accordance with the
standards of the applicable country
and region.
Earth wiring 2.0mm
2
Power supply
Single phase
(50/60Hz)
maximum of 64 groups
4-M3.5
* 2
* 3
* 1
F1 F2
F1 F2
LONWORKS
®
Network
CAUTION
Make sure the power supply is off
when carrying out the following work.
1. When taking off the Front Cover
2. When operating the Connectors/Switches
on PCB.
F1 F2 T1 T2
LD
100-240V
~
50/60Hz
N
L
POWER
3-M4
Summary of Contents for D-BACS
Page 1: ...ED 72 721 Preliminary Daikin Buildings Air conditioning Control System D BACS DESIGN GUIDE ...
Page 17: ...xvi 1 5 Open Network Glossary Introduction ...
Page 41: ...24 Outline of D BACS System ...
Page 74: ...57 Remote Controllers HRV Wired remote controller BRC301B61 VAM ...
Page 107: ...90 5 4 HRV BRC301B61 Remote Controllers ...
Page 142: ...1 2 System Configuration 125 Control Devices 1 2 System Configuration System Outline ...
Page 181: ...164 3 8 Error Diagnosing Function Control Devices ...
Page 215: ...198 3 8 Wiring Example intelligent Manager ...
Page 235: ...218 Interface for Use in BACnet ...
Page 253: ...236 Interface for use in LONWORKS 10 Reference Materials Error Code Conversion Table ...
Page 268: ...251 Interface for use in LONWORKS 13 Workflow ...
Page 285: ...268 1 6 Notes Power Proportional Distribution P P D ...