
1.5 Dio Unit (DEC102A51)
301
Adaptor
Terminal used in the case of setting to "Instantaneous Output"
Operation
input terminal
Abnormal
input terminal
Terminal used in the case of setting to "Continuous Output"
Stop
output terminal
Operation
output terminal
Abnormal
input terminal
Operation
input terminal
Facility equipment
(Up to 2 units can be connected to
single DEC102A51.)
1st equipment
2nd equipment
Run/Stop output terminal
CD
CD
CD
CD
CD
CD
D1
D3
CD
CD
C2
C4
CM
CM
M1
M2
CA
CA
A1
A2
D1
D2
D3
D4
CM
CM
CM
CM
M1
M2
M3
M4
CA
CA
CA
CA
A1
A2
A3
A4
Facility equipment
(Up to 4 units can be connected to
single DEC102A51.)
1st equipment
2nd equipment
3rd equipment
4th equipment
DEC102A51
CA
A1~4
K4R
Facility equipment
error status
DEC102A51
CM
M1~4
K3R
Facility equipment
operating status
Facility equipment operating status input wiring
Facility equipment error status input wiring
When the contact is "Closed", "Run" is to be inputted.
Input SPEC: No-voltage "a" contact (When the applied voltage is 20 to 30V DC and the contact is "Closed",
the welding current is approx. 10mA.)
For input, use a contact for micro current. (12V DC, 1mA max.)
Operation input
Abnormal input
When the contact is "Open" or "Closed", "Error" is produced. For changeover, refer to 2. Initial Setting
Input specifications: No-voltage "a" contact (The welding current is approx. 10mA when the applied voltage is 20
to 30V DC and the contact is "Closed".)
For input, use the contact for micro current. (12V DC, 1mA max.)
When the switch was set to "Ins." (Instantaneous Output), the operation input terminals M3, M4 and abnormal
input terminals A3, A4 are not used.
Terminal used in case where the switch was set to "Continuous Output" (Con.) or "Instantaneous Output" (Ins.)
When the switch was set to "Ins." (Instantaneous Output), the operation input terminals M3, M4 and
abnormal input terminals A3, A4 are not used.
Power Supply & Earth Wiring
•
For power supply, 1~200-240V is used. The wiring to the power terminal block (L/N) is required.
The electric wire used should be 1.25 to 2.0mm
2
.
After checking the power supply specifications, make correct connections.
•
Connect the earth wiring to the " " terminal. Use a 2.0mm
2
wire.
Summary of Contents for D-BACS
Page 1: ...ED 72 721 Preliminary Daikin Buildings Air conditioning Control System D BACS DESIGN GUIDE ...
Page 17: ...xvi 1 5 Open Network Glossary Introduction ...
Page 41: ...24 Outline of D BACS System ...
Page 74: ...57 Remote Controllers HRV Wired remote controller BRC301B61 VAM ...
Page 107: ...90 5 4 HRV BRC301B61 Remote Controllers ...
Page 142: ...1 2 System Configuration 125 Control Devices 1 2 System Configuration System Outline ...
Page 181: ...164 3 8 Error Diagnosing Function Control Devices ...
Page 215: ...198 3 8 Wiring Example intelligent Manager ...
Page 235: ...218 Interface for Use in BACnet ...
Page 253: ...236 Interface for use in LONWORKS 10 Reference Materials Error Code Conversion Table ...
Page 268: ...251 Interface for use in LONWORKS 13 Workflow ...
Page 285: ...268 1 6 Notes Power Proportional Distribution P P D ...