271
Power Proportional Distribution (P.P.D.)
4. intelligent Manager III (DAM602B51) with P.P.D. Application
Outdoor Unit
L3 N
L2
L1
A B C F1F2 F1F2 Q1Q2
PC,Monitor,Hub,
Sub PC
[Field Supply]
Outdoor Unit
L3 N
L2
L1
A B C F1F2 F1F2 Q1Q2
LAN
(Eth ernet)
Outdoor Unit
L3 N
L2
L1
A B C F1 F2 F1 F2 Q1 Q2
Outdoor Unit
L3
N
L2
L1
A B C F1 F2 F1 F2 Q1 Q2
Outdoor Unit
L3
N
L2
L1
A B C F1 F2 F1 F2 Q1 Q2
F1 F2 P1 P2
Indoor Unit
Outdoor Unit
L3 N
L2
L1
A B C F1F2 F1F2 Q1Q2
F1 F2 P1 P2
Indoor Unit
R/C
R/C
up to
64×2
units of
A/Cs and equipment
The UPS is required for transmitting the interruption signal for the UPS
above to the intelligent manager III body.
APC AP9610
Field Supply
The UPS supplies power to the intelligent manager III body, PC and hub.
APC SU700 or SU1000 Series
Field Supply
UPS
•Performance :
Pentium III:800MHz,Memory:256MB,HDD:4G
•Network:100Base/T Ethernet
•Operation:Keyboard/Mouse,Sound and Speaker
•Software:
Windows XP(Professional SP2 or later)
Windows 2000(Professional SP4 or later)
•CRT:SVGA(800x600,1024x768,1280x1024 )
Field Supply
PC
The hub is required for connecting the intelligent manager III body and a
PC. It is connected to the Line port.
Supporting 100Base/T
Field Supply
HUB
DIII Port: with 4 ports
DAM602B51
DAIKIN
intelligent
Manager III
body
Remark
Model/Spec
Arrangement
Equipment
3
φ
4w 380-415V 50Hz
[Power Supply]
kWh-meters [Field Supply]
PC
Sub PC
Refer to field wiring on previous page about
power supply wiring.
Note)
up to
64×2
units of
A/Cs and equipment
R/C
F1 F2 P1 P2
Indoor Unit
•1 pulse to 1 kW·h or 10 kW·h pulse width must be within 40-400 m/sec.
•Output relay must be electronic type only. No voltage output
•Pulse transmitter
Field Supply
kW·h meter
Option for power proportional distribution
Activation number card included
DAM002A51
DAIKIN
P.P.D.
Remark
Model/Spec
Arrangement
Equipment
Power Supply
DIII
Contact Signal
R/C
F1 F2 P1 P2
Indoor Unit
F1 F2 P1 P2
Indoor Unit
R/C
UPS
[Field Supply]
R/C
[Power Supply]
1
φ
220-240V 50Hz
Note) Decide the number of kWh meter according to control system design.
The power consumption of the outdoor unit can be
proportionally calculated for each indoor unit using the Power
Proportional Distribution software. The calculated results are
recorded in the PC.
The data recorded in the PC can be handled using any
spreadsheet software including Excel.
Remote Control
256 units
Connectable
1G2
3G4
5G
6
7G
8
9
G
10 11 G
12
13
G
14
15
G
16
Summary of Contents for D-BACS
Page 1: ...ED 72 721 Preliminary Daikin Buildings Air conditioning Control System D BACS DESIGN GUIDE ...
Page 17: ...xvi 1 5 Open Network Glossary Introduction ...
Page 41: ...24 Outline of D BACS System ...
Page 74: ...57 Remote Controllers HRV Wired remote controller BRC301B61 VAM ...
Page 107: ...90 5 4 HRV BRC301B61 Remote Controllers ...
Page 142: ...1 2 System Configuration 125 Control Devices 1 2 System Configuration System Outline ...
Page 181: ...164 3 8 Error Diagnosing Function Control Devices ...
Page 215: ...198 3 8 Wiring Example intelligent Manager ...
Page 235: ...218 Interface for Use in BACnet ...
Page 253: ...236 Interface for use in LONWORKS 10 Reference Materials Error Code Conversion Table ...
Page 268: ...251 Interface for use in LONWORKS 13 Workflow ...
Page 285: ...268 1 6 Notes Power Proportional Distribution P P D ...