1.6 Di Unit (DEC101A51)
317
Adaptor
2. Initial setting
z
DEC101A51 Switch Settings
Note:
All are set to “OFF” upon shipment from factory.
Name
Operation
OFF
ON
DS2
Abnormal input detection Open/Close
(Concentrated a4 to 7)
Abnormal input detection method
Open: Close (Normal)
→
Open (Abnormal)
Close: Open (Normal)
→
Close (Abnormal)
Open
Close
DS3
Abnormal input detection Open/Close
(Concentrated a0 to 3)
Open
Close
DS4
Buzzer output ON/OFF (Concentrated
a4 to 7)
ON/OFF switching of buzzer output of
buzzer unit upon detection of failure.
ON
OFF
DS5
Buzzer output ON/OFF (Concentrated
a0 to 3)
ON
OFF
DS6-1
Startup failure
Masking time after detecting operation
input.
10 seconds
30 seconds
DS6-2
Failure detection
Recovery method upon detection of
failure.
Automatic
reset
Retained
DS6-3
Monitor input
Detection of failure under halting status.
Yes
No
ON
This indicates the switch knob.
ON
ON
07
D
5
04
13
3
4
7
09
11
Position
08
10
2
9
C
Address No.
(low order)
A
0
05
E
6
06
12
01
B
8
03
14
00
15
02
F
1
ON
ON
1-08
Control range DS1
2-00 ~ 2-15
High
order : 1
1-00 ~ 1-15
RS1 Switch Setting Table
<Example>
When Address No.
is set to 1-08
Address No. indicates the
following portion in this case.
Low
order : 8
Control range DS1
setting
RS2
Set Address No. (low order) with the centralized address setting switch (RS1).
Referring to the table below, set the address number low order.
(Address Nos. are 1-00, 1-01, --- 1-15, 2-00, --- 4-15.)
<when a product is
discharged from the factory>
Low
order
DS1
8
when a product is
discharged from the factory
High
order
In this case, it follows
that this equipment uses
Address Nos.
1-08 to 1-15.
(8 numbers max.)
3-00 ~ 3-15
4-00 ~ 4-15
Set the top address of this equipment with the DIII-NET setting switch (DS1/RS1).
Using the DIII-NET setting switch (DS1), set the range of Address No. that is set in this equipment.
Address Nos. 1-00 to 1-15 are factory controlled before shipment.
(high order)
(Address range)
Summary of Contents for D-BACS
Page 1: ...ED 72 721 Preliminary Daikin Buildings Air conditioning Control System D BACS DESIGN GUIDE ...
Page 17: ...xvi 1 5 Open Network Glossary Introduction ...
Page 41: ...24 Outline of D BACS System ...
Page 74: ...57 Remote Controllers HRV Wired remote controller BRC301B61 VAM ...
Page 107: ...90 5 4 HRV BRC301B61 Remote Controllers ...
Page 142: ...1 2 System Configuration 125 Control Devices 1 2 System Configuration System Outline ...
Page 181: ...164 3 8 Error Diagnosing Function Control Devices ...
Page 215: ...198 3 8 Wiring Example intelligent Manager ...
Page 235: ...218 Interface for Use in BACnet ...
Page 253: ...236 Interface for use in LONWORKS 10 Reference Materials Error Code Conversion Table ...
Page 268: ...251 Interface for use in LONWORKS 13 Workflow ...
Page 285: ...268 1 6 Notes Power Proportional Distribution P P D ...