2.8 Installation
Control Devices
2.8
Installation
1. Open the upper part of remote controller.
Insert a minus screwdriver (2 locations) into the recess between the upper part and the lower part of remote controller
and twist the screwdriver lightly.
2. Open the upper part of remote controller and install the electrical box (part to be procured in the field) with the
attached installation screws (M4×16).
Note:
Suitable length of the electric wire is about 160mm from the inlet of the electrical box. If it is difficult to contain a long
wiring, strip the sheathed part of the wiring.
C: 1P162827
PC board is attached with both the upper and lower part of remote
controller. Do not damage the board with the screwdriver.
– screwdriver
(2 locations)
Wiring for
transmission
Do not contain the power supply
and the transmission wiring in the
same conduit tube.
Installation screws
(2 screws)
(Part to be procured
in the field)
Electric parts
box
Power supply
wiring
Summary of Contents for D-BACS
Page 1: ...ED 72 721 Preliminary Daikin Buildings Air conditioning Control System D BACS DESIGN GUIDE ...
Page 17: ...xvi 1 5 Open Network Glossary Introduction ...
Page 41: ...24 Outline of D BACS System ...
Page 74: ...57 Remote Controllers HRV Wired remote controller BRC301B61 VAM ...
Page 107: ...90 5 4 HRV BRC301B61 Remote Controllers ...
Page 142: ...1 2 System Configuration 125 Control Devices 1 2 System Configuration System Outline ...
Page 181: ...164 3 8 Error Diagnosing Function Control Devices ...
Page 215: ...198 3 8 Wiring Example intelligent Manager ...
Page 235: ...218 Interface for Use in BACnet ...
Page 253: ...236 Interface for use in LONWORKS 10 Reference Materials Error Code Conversion Table ...
Page 268: ...251 Interface for use in LONWORKS 13 Workflow ...
Page 285: ...268 1 6 Notes Power Proportional Distribution P P D ...