184
3.1 Components
intelligent Manager
3. Installation and Electric Wiring
3.1
Components
The following parts are attached to this unit.
Make sure to check them before installation.
3.2
Part Name and Function
intelligent Processing Unit
1 set
INSTALLATION MANUAL
1 copy
DIII-4
RCV
DIII-3
RCV
DIII BOARD
275 ± 1
10BASE-T
100BASE-TX
RS232C-2
PO
WER
OFF
ON
263 ± 1
(15)
(13)
Di BO
ARD
68.5 ± 2
260 ± 1
130 ± 1
F2
F1
F1
F2
Turn this switch to
ON when using
Power supply switch
G1
0
48
6G
12
5
2G
1
5
11
16
14
G
GG
G
3G
9
71
3
Di
1
RS232C connector
-1
connect equipment
for RS232C
2
Do-2
T-
Terminal block for
communication with
air conditioners
R-
L
3
Make sure to connect
the earth wire
Terminal block for
communication with
air conditioners (This
terminal is not in
DAM602B52)
-2
RS485
ETHER
DIII
F1
Terminal block for
RS485 communication
Terminal block for
DIII-NET communication
ALRM
A2
When using AIRNET
service, connect it to
the telephone line
F2
G
PCMCIA
RCV
LINK
Terminal block for DIII-NET
communication (option)
AC100-240V
~
50/60Hz
Detailed drawing of fixing hole
Modem connector
for AIRNET
ALIVE
RS485
Connect the lines
with AC100-240V
Do-1
RxD
Do-1 : equipment for the contact
output is connected (No Voltage)
Do-2 : equipment for the contact
output is connected (No Voltage)
4
Connector for
PC communication
R+
F2
B2
POWER
Terminal block for
contact input (No Voltage)
Terminal block for
contact input (No Voltage)
connected to PC (HUB)
G
1
ETHER
BACKUP
TxD
-2
connect equipment
for RS485
Power supply
terminal block
T+
N
B1
Terminal block for
contact output (No Voltage)
contact input in 4 points
is connected (No Voltage)
connect equipment
for RS232C
A1
contact input in 16 points
is connected (No Voltage)
Di
-1
F1
RS232C connector
Earth terminal block
RS232C
DAIKIN D-BACS
DIII-3
DIII-4
DIII-1
DIII-2
CPU
R2.25
4.5
9
φ
10
PHONE
Summary of Contents for D-BACS
Page 1: ...ED 72 721 Preliminary Daikin Buildings Air conditioning Control System D BACS DESIGN GUIDE ...
Page 17: ...xvi 1 5 Open Network Glossary Introduction ...
Page 41: ...24 Outline of D BACS System ...
Page 74: ...57 Remote Controllers HRV Wired remote controller BRC301B61 VAM ...
Page 107: ...90 5 4 HRV BRC301B61 Remote Controllers ...
Page 142: ...1 2 System Configuration 125 Control Devices 1 2 System Configuration System Outline ...
Page 181: ...164 3 8 Error Diagnosing Function Control Devices ...
Page 215: ...198 3 8 Wiring Example intelligent Manager ...
Page 235: ...218 Interface for Use in BACnet ...
Page 253: ...236 Interface for use in LONWORKS 10 Reference Materials Error Code Conversion Table ...
Page 268: ...251 Interface for use in LONWORKS 13 Workflow ...
Page 285: ...268 1 6 Notes Power Proportional Distribution P P D ...