E1200 HT 260-3
9BPreventive Maintenance
23.04.07
10-10
00401010_41087
10.7.1
Checking the Distributor Cabinet Overtemp and Fan Function (CAN Control)
WARNING - High Voltage!
All electrical works at the system may only be carried out by qualified workers.
Power terminals are located in the area of the heating cassette and transformer
overtemperature controllers. Touching these power terminals is dangerous to life.
Avoid touching the power terminals by all means.
Readjust the Overtemperature Monitors to the initial control temperature after the
overtemperature tests.
1. Check if all heating zones in the stacks are cyclically polled for overtemperature
every 20-30 s per heating zone.
2. Visually inspect the spike thermocouples of the heating cassette.
3. Check the heating power switch-off in case of overtemperature.
—
Disconnect a spike thermocouple.
—
The heating must switch off.
—
Observe the power display. The heating relay switch must switch off, listen for
switching sound.
4. Check the overtemperature controller for heating cassette. The heating power
must be switched off in case of a heating cassette overtemperature.
—
Unplug the cable from the temperature controller.
—
The heating must switch off.
—
Observe the power display. The heating relay switch must switch off, listen for
switching sound. After the test, plug in the cable again.
5. Check the overtemperature controller for the transformer.
—
Unplug the cable from the transformer temperature controller.
—
The CMI user interface must display a warning message. After the test, plug in
the cable again.
6. Check the function of the fans between the plug-in units. Exchange defective fans
immediately. Insufficient cooling leads to locally increased temperatures and
failures in electronic components.
10.7.2
Checking the Distributor Cabinet Overtemp. and Fan Function (19"-Rack)
Readjust the Overtemperature Monitors to the initial control temperature after the
overtemperature tests.
Summary of Contents for E1200 HT 260-3
Page 1: ...Operating Instructions for Horizontal Furnace Equipment E1200 HT 260 3 Version 1 0 1_41087 11 ...
Page 2: ...E1200 HT 260 3 23 04 07 00401010_41087 ...
Page 4: ...E1200 HT 260 3 Document Information 23 04 07 00401010_41087 ...
Page 16: ...E1200 HT 260 3 Index 23 04 07 00401010_41087 ...
Page 18: ...E1200 HT 260 3 List of Figures 23 04 07 00401010_41087 ...
Page 20: ...E1200 HT 260 3 List of Tables 23 04 07 00401010_41087 ...
Page 26: ...E1200 HT 260 3 0BOperating Instruction Remarks 23 04 07 1 6 00401010_41087 ...
Page 34: ...E1200 HT 260 3 1BIntroduction 23 04 07 2 8 00401010_41087 ...
Page 50: ...E1200 HT 260 3 2BSafety 23 04 07 3 16 00401010_41087 ...
Page 78: ...E1200 HT 260 3 4BTransport 23 04 07 5 4 00401010_41087 ...
Page 180: ...E1200 HT 260 3 8BMaintenance 23 04 07 9 76 00401010_41087 ...
Page 228: ...E1200 HT 260 3 10BSpare and Wearing Parts 23 04 07 11 2 00401010_41087 ...