9.4.2.5
Installing the Vacuum Process Tube in PECVD Systems
Use only process tubes calibrated in accordance with the centrotherm drawing.
Otherwise, due to the different expansion factors the process tube may be destroyed in
the flange area during the heating-up.
Keep ready for the installation:
—
quartz parts for thermocouple and tube case
—
quartz parts for HF lances and HF contact tips
—
all O-rings
—
VCR seals
Proceed as follows to install the process tube:
1. De-energize the heating after baking out the heating cassette, then wait until the
heating cassette has cooled down to room temperature.
2. Pull the spike thermocouples back by 10 mm at the heating cassette.
3. Slide the process tube into the heating cassette.
4. The process tube must be positioned in the heating cassette as follows:
—
centrically towards the flange on the toxic gas exhaust side
—
protruding 15 mm over the vacuum base flange into the toxic gas exhaust
—
centrically towards the rear flange, the flange can be adjusted
—
horizontally aligned, use spirit level to check
5. Install the insulating rings on the gas cabinet and toxic gas exhaust side. Avoid
hollows to achieve good insulation.
6. Clean all flange parts and O-rings before installing them.
7. Slide the O-ring over the process tube.
8. Insert packing cord into the flange at the toxic gas exhaust side.
9. Slide the flange onto the centering pins at the toxic gas exhaust side and manually
tighten the nuts. The process tube is moved backwards into the correct position.
10. Connect the water and gas supply lines to the flange at the toxic gas exhaust side.
11. Use the adjusting bolts on the gas side to adjust the flange so that the process
tube has a play of 2 mm in axial direction.
12. Slide the O-ring over the process tube.
Summary of Contents for E1200 HT 260-3
Page 1: ...Operating Instructions for Horizontal Furnace Equipment E1200 HT 260 3 Version 1 0 1_41087 11 ...
Page 2: ...E1200 HT 260 3 23 04 07 00401010_41087 ...
Page 4: ...E1200 HT 260 3 Document Information 23 04 07 00401010_41087 ...
Page 16: ...E1200 HT 260 3 Index 23 04 07 00401010_41087 ...
Page 18: ...E1200 HT 260 3 List of Figures 23 04 07 00401010_41087 ...
Page 20: ...E1200 HT 260 3 List of Tables 23 04 07 00401010_41087 ...
Page 26: ...E1200 HT 260 3 0BOperating Instruction Remarks 23 04 07 1 6 00401010_41087 ...
Page 34: ...E1200 HT 260 3 1BIntroduction 23 04 07 2 8 00401010_41087 ...
Page 50: ...E1200 HT 260 3 2BSafety 23 04 07 3 16 00401010_41087 ...
Page 78: ...E1200 HT 260 3 4BTransport 23 04 07 5 4 00401010_41087 ...
Page 180: ...E1200 HT 260 3 8BMaintenance 23 04 07 9 76 00401010_41087 ...
Page 228: ...E1200 HT 260 3 10BSpare and Wearing Parts 23 04 07 11 2 00401010_41087 ...