E
IGNITION SYSTEM
ELEC
B
W
IGNITION SYSTEM PEAK VOLTAGE
w
When checking the T.C.I. system do not
touch any of the connections of the digital
tester lead wires and high-tension cord.
1. Remove:
9
Spark plug cap
2. Disconnect:
9
Ignitor ass’y lead (W)
3. Measure:
9
Ignitor ass’y output peak voltage
Below specification
®
Replace the or
check the ignitor ass’y.
8-7
Output peak voltage
W-B
Cranking (300 r/min)
Opened
V
126
Ignitor ass’y coil resistance
1. Remove:
9
Ignitor ass’y
2. Measure:
9
Ignitor ass’y coil resistance
Out of specification
®
Replace.
Measuring steps:
8
Connect the pocket tester (
½
x1) to the
ignitor ass’y lead.
Primary:
Tester (+) lead
®
White lead
Tester (-) lead
®
Black lead
Ignitor ass’y coil resistance:
Primary coil: 0.56 ~ 0.84
½
B
W
Содержание F4
Страница 106: ...E FUEL PUMP FUEL 4 7 SERVICE POINTS Fuel pump inspection 1 Inspect 9Diaphragm Damage Replace ...
Страница 296: ...E TRBL ANLS CHAPTER 9 TROUBLE ANALYSIS TROUBLE ANALYSIS 9 1 TROUBLE ANALYSIS CHART 9 1 ...
Страница 306: ......
Страница 307: ...Printed in JAPAN February 1998 2 09 1 n 67D 28197 Z8 C1 F4AMH Printed on recycled paper YAMAHA MOTOR CO LTD ...