E
UPPER CASE ASS’Y
BRKT
UPPER CASE ASS’Y
EXPLODED DIAGRAM
12
9
9
7
8
18
11
10
6
5
13
17
15
10
10
3
4
16
14
2
1
M6 x 25 mm
4.5 Nm (0.45 m•kg, 3.25 ft•lb)
1st 3 Nm (0.3 m•kg, 2.17 ft•lb)
2nd 8 Nm (0.8 m•kg, 5.8 ft•lb)
M6 x 10 mm
1st 3 Nm (0.3 m•kg, 2.17 ft•lb)
2nd 8 Nm (0.8 m•kg, 5.8 ft•lb)
M6 x 35 mm
7-7
REMOVAL AND INSTALLATION CHART
Step
1
2
3
4
5
6
7
8
Q’ty
1
1
1
1
1
1
2
1
Service points
Follow the left “Step” for removal.
Refer to “POWER UNIT” section in Chapter 5.
Refer to “LOWER UNIT” section in Chapter 6.
Refer to “STEERING HANDLE” section.
Procedure/Part name
UPPER CASE ASS’Y REMOVAL
Power unit
Lower unit
Steering handle
Screw (shift lever)
Shift lever ass’y
Bolt (shift shaft)
Shift rod ass’y
Water tube
Steering friction screw ass’y
Bolt (tilt lock plate)
Tilt lock plate
Содержание F4
Страница 106: ...E FUEL PUMP FUEL 4 7 SERVICE POINTS Fuel pump inspection 1 Inspect 9Diaphragm Damage Replace ...
Страница 296: ...E TRBL ANLS CHAPTER 9 TROUBLE ANALYSIS TROUBLE ANALYSIS 9 1 TROUBLE ANALYSIS CHART 9 1 ...
Страница 306: ......
Страница 307: ...Printed in JAPAN February 1998 2 09 1 n 67D 28197 Z8 C1 F4AMH Printed on recycled paper YAMAHA MOTOR CO LTD ...