E
STEERING HANDLE
BRKT
STEERING HANDLE
EXPLODED DIAGRAM
1
2
3
5
6
7
8
9
4
M8 x 25 mm
M8 x 30 mm
18 Nm (1.8m•kg, 13 ft•lb)
7-3
REMOVAL AND INSTALLATION CHART
Step
1
2
3
Q’ty
1
1
1
Service points
Follow the left “Step” for removal.
NOTE:
Disconnect from the power unit side.
Procedure/Part name
STEERING HANDLE REMOVAL
Carrying handle2 (protector)
Bottom cowling 2
Carrying handle 1
Engine stop switch lead
Choke wire
Throttle cable
Bottom cowling 1
Bolt (steering handle ass’y)
Steering handle cover
Collar
Содержание F4
Страница 106: ...E FUEL PUMP FUEL 4 7 SERVICE POINTS Fuel pump inspection 1 Inspect 9Diaphragm Damage Replace ...
Страница 296: ...E TRBL ANLS CHAPTER 9 TROUBLE ANALYSIS TROUBLE ANALYSIS 9 1 TROUBLE ANALYSIS CHART 9 1 ...
Страница 306: ......
Страница 307: ...Printed in JAPAN February 1998 2 09 1 n 67D 28197 Z8 C1 F4AMH Printed on recycled paper YAMAHA MOTOR CO LTD ...