v
Follow the suggested actions in the order in which they are listed in the Action column until the problem is
solved.
v
See Chapter 3, “Parts listing, Types 7901 and 7902,” on page 19 to determine which components are CRUs and
which components are FRUs.
v
If an action step is preceded by “(Trained service technician only),” that step must be performed only by a
trained service technician.
Error code
Description
Action
161
Real-time clock battery failure
1.
Run the Setup Utility program (see “Using the
Setup Utility program” on page 11).
2.
Reseat the battery (see “Removing the battery”
on page 48 and “Installing the battery” on page
48).
3.
Replace the following components one at a time,
in the order shown, restarting the blade server
each time:
a.
Battery (see “Removing the battery” on page
48 and “Installing the battery” on page 48)
b.
(Trained service technician only) system-board
assembly (see “Removing the system-board
assembly” on page 62 and “Installing the
system-board assembly” on page 62)
162
Invalid configuration information or CMOS
RAM checksum failure.
1.
Run the Setup Utility program, select
Load
Default Settings
, and save the settings (see
“Using the Setup Utility program” on page 11).
2.
Reseat the battery (see “Removing the battery”
on page 48 and “Installing the battery” on page
48).
3.
Replace the following components one at a time,
in the order shown, restarting the blade server
each time:
a.
Battery (see “Removing the battery” on page
48 and “Installing the battery” on page 48)
b.
(Trained service technician only) system-board
assembly (see “Removing the system-board
assembly” on page 62 and “Installing the
system-board assembly” on page 62)
163
Time of day not set.
1.
Run the Setup Utility program, select
Load
Default Settings
, make sure that the date and
time are correct, and save the settings (see “Using
the Setup Utility program” on page 11).
2.
Reseat the battery (see “Removing the battery”
on page 48 and “Installing the battery” on page
48).
3.
Replace the following components one at a time,
in the order shown, restarting the blade server
each time:
a.
Battery (see “Removing the battery” on page
48 and “Installing the battery” on page 48)
b.
(Trained service technician only) system-board
assembly (see “Removing the system-board
assembly” on page 62 and “Installing the
system-board assembly” on page 62)
Chapter 5. Diagnostics
81
Содержание LS42 - BladeCenter - 7902
Страница 1: ...BladeCenter LS22 Type 7901 and LS42 Type 7902 Problem Determination and Service Guide...
Страница 2: ......
Страница 3: ...BladeCenter LS22 Type 7901 and LS42 Type 7902 Problem Determination and Service Guide...
Страница 12: ...x BladeCenter LS22 Type 7901 and LS42 Type 7902 Problem Determination and Service Guide...
Страница 76: ...64 BladeCenter LS22 Type 7901 and LS42 Type 7902 Problem Determination and Service Guide...
Страница 192: ...180 BladeCenter LS22 Type 7901 and LS42 Type 7902 Problem Determination and Service Guide...
Страница 193: ......
Страница 194: ...Part Number 49Y0107 Printed in USA 1P P N 49Y0107...