ASDA-A3 Motion Control
7-9
7
Before issuing
command
Command in
execution
Execution
completed
Motor
positioned
Command trigger
DI: CTRG
Command Cmd
PR position command
completed
DO: Cmd_OK
Motor reaches target
position
DO: TPOS
Servo procedure
completed
DO: MC_OK
Cmd_O(Pulse)
–
Fb_Pulse < P1.054
Figure 7.1.2.3 Operation of DI/DO signals in PR mode
Cmd_O(Pulse)
–
Fb_Pulse < P1.054
Before issuing
command
Command in
execution
Command
completed
Motor
positioned
Command trigger
DI: CTRG
Command Cmd
PR position command
completed
DO: Cmd_OK
Delay time
Motor reaches
target position
DO: TPOS
Servo procedure
completed
DO: MC_OK
Motor in
operation
Figure 7.1.2.4 Operation of DI/DO signals in PR mode (including delay time)
Содержание ASDA-A3 Series
Страница 15: ... This page is intentionally left blank ...
Страница 89: ...Wiring ASDA A3 3 38 3 Pin assignment for the CN1 quick connector J2 and J1 ...
Страница 91: ...Wiring ASDA A3 3 40 3 Wiring for CN1 quick connector and installation Installation ...
Страница 296: ...ASDA A3 Motion Control 7 99 7 Figure 7 3 4 6 ASDA Soft Speed fitting setting interface for creating E Cam table ...
Страница 320: ...ASDA A3 Motion Control 7 123 7 Figure 7 3 7 14 ASDA Soft rotary shear intermittent printing machine setting interface ...
Страница 373: ...Motion Control ASDA A3 7 176 7 This page is intentionally left blank ...
Страница 605: ...Parameters ASDA A3 8 232 8 This page is intentionally left blank ...
Страница 623: ...MODBUS Communication ASDA A3 9 18 9 This page is intentionally left blank ...
Страница 645: ...Absolute System ASDA A3 10 22 10 This page is intentionally left blank ...
Страница 661: ...Linear Motor ASDA A3 11 16 11 This page is intentionally left blank ...
Страница 793: ...Troubleshooting ASDA A3 13 48 13 This page is intentionally left blank ...
Страница 819: ...Specifications ASDA A3 A 26 A This page is intentionally left blank ...
Страница 841: ...Accessories ASDA A3 B 22 B This page is intentionally left blank ...