Motion Control
ASDA-A3
7-102
7
7.3.5 E-Cam curve and PR command overlapping
When the E-Cam curve is operating, if you trigger a PR path of incremental position command,
the E-Cam command is overlapped with the PR command. As shown in the upper part of Figure
7.3.5.1, the moving direction of the slave axis is the same as that set in the incremental position
command. When the slave axis is moving at 300 rpm and you trigger an incremental position
command with the target speed of 200 rpm in the same direction, the slave axis overlaps the
PR incremental position command with the E-Cam command and completes the 5000 PUU
incremental position command at the target speed of 500 rpm. As shown in the lower part of
Figure 7.3.5.1, the moving direction of the slave axis is opposite to that set in the incremental
position command. When the slave axis is moving at 300 rpm and you trigger an incremental
position command with the target speed of 200 rpm in the reverse direction, the slave axis
executes the E-Cam command at the target speed of 100 rpm. Then, it resumes the original
speed after the incremental position command of -5000 PUU is executed completely.
Slave axis speed
Time
Slave axis speed
Time
+
=
Slave axis speed
Time
PR#51 (I)
Position
DLY = [0] 0 ms
5000 PUU
INC
200 rpm
300
1000
200
300
1000
500
Slave axis speed
Time
Slave axis speed
Time
+
=
Slave axis speed
Time
PR#51 (I)
Position
DLY = [0] 0 ms
-5000 PUU
INC
200 rpm
300
1000
-200
300
1000
100
Time
Figure 7.3.5.1 Overlapping of E-Cam command and PR incremental position command
To change the E-Cam phase when E-Cam is operating, use the PR incremental position
command. Both the phase alignment function and macro for the rotary shear, which align the
E-Cam phase, are completed by this command overlapping method. For more about this
function, refer to Sections 7.3.7 and 7.3.9.
Содержание ASDA-A3 Series
Страница 15: ... This page is intentionally left blank ...
Страница 89: ...Wiring ASDA A3 3 38 3 Pin assignment for the CN1 quick connector J2 and J1 ...
Страница 91: ...Wiring ASDA A3 3 40 3 Wiring for CN1 quick connector and installation Installation ...
Страница 296: ...ASDA A3 Motion Control 7 99 7 Figure 7 3 4 6 ASDA Soft Speed fitting setting interface for creating E Cam table ...
Страница 320: ...ASDA A3 Motion Control 7 123 7 Figure 7 3 7 14 ASDA Soft rotary shear intermittent printing machine setting interface ...
Страница 373: ...Motion Control ASDA A3 7 176 7 This page is intentionally left blank ...
Страница 605: ...Parameters ASDA A3 8 232 8 This page is intentionally left blank ...
Страница 623: ...MODBUS Communication ASDA A3 9 18 9 This page is intentionally left blank ...
Страница 645: ...Absolute System ASDA A3 10 22 10 This page is intentionally left blank ...
Страница 661: ...Linear Motor ASDA A3 11 16 11 This page is intentionally left blank ...
Страница 793: ...Troubleshooting ASDA A3 13 48 13 This page is intentionally left blank ...
Страница 819: ...Specifications ASDA A3 A 26 A This page is intentionally left blank ...
Страница 841: ...Accessories ASDA A3 B 22 B This page is intentionally left blank ...