- During work, reliable communi-
cation between the operator and
the personnel on the platform must
always be ensured.
- Prior to each ,the operator must
check the working platform for
perfect and safe condition.
- Before commissioning and when
significant modifications were
made to the platform, it must be
checked by a specialist. Regular
checks at intervals that depend
on the frequency of application
must also be performed.
Mounting the working platform
(1) Insert the key in the key-
operated switch (6-20/arrow).
NOTE
Insert the key only when the loader
is at a standstill.
(2) Move the bucket arm to the lower-
most position, keep the actuator for
the dump interlock on the pilot valve
for the auxiliary hydraulics (4-9/5)
pressed and tilt down the quick-
change device using the pilot valve
for the working hydraulics (4-10/2).
(3) Move the loader to the working
platform.
(4) Keep the actuator for the dump
interlock on the pilot valve for the
auxiliary hydraulics (4-9/5) pressed,
pick up the working platform with
the quick-change device and lift it
while tilting the quick-change device
until the working platform makes
contact with the quick-change device.
NOTE
The bucket's swiveling radius is now
restricted to 25° to the right or to the
left.
- During work, reliable communi-
cation between the operator and
the personnel on the platform must
always be ensured.
- Prior to each ,the operator must
check the working platform for
perfect and safe condition.
- Before commissioning and when
significant modifications were
made to the platform, it must be
checked by a specialist. Regular
checks at intervals that depend
on the frequency of application
must also be performed.
Mounting the working platform
(1) Insert the key in the key-
operated switch (6-20/arrow).
NOTE
Insert the key only when the loader
is at a standstill.
(2) Move the bucket arm to the lower-
most position, keep the actuator for
the dump interlock on the pilot valve
for the auxiliary hydraulics (4-9/5)
pressed and tilt down the quick-
change device using the pilot valve
for the working hydraulics (4-10/2).
(3) Move the loader to the working
platform.
(4) Keep the actuator for the dump
interlock on the pilot valve for the
auxiliary hydraulics (4-9/5) pressed,
pick up the working platform with
the quick-change device and lift it
while tilting the quick-change device
until the working platform makes
contact with the quick-change device.
NOTE
The bucket's swiveling radius is now
restricted to 25° to the right or to the
left.
Содержание AS 65
Страница 61: ...S05D S06D S05D S06D Beschilderung Beschilderung Signalisation Signalisation Signs Signs ...
Страница 106: ...S05D S06D 3 11 3 3 3 Frontbagger Pelle frontale Front end excavator ...
Страница 108: ...S05D S06D 3 12 3 3 4 Greifer Benne preneuse Grab ...
Страница 110: ...S05D S06D 3 3 5 Lasthaken 3 13 Crochet de grue Lifting hook ...
Страница 116: ...S05D S06D 3 16 3 4 3 Frontbagger Pelle frontale Front end excavator ...
Страница 118: ...S05D S06D 3 17 3 4 4 Greifer Benne preneuse Grab ...
Страница 120: ...S05D S06D 3 18 3 4 5 Lasthaken Crochet de grue Lifting hook ...
Страница 122: ...S05D S06D S05D S06D Beschreibung Beschreibung Description Description Description Description ...
Страница 148: ...S05D S06D S05D S06D Bedienung Bedienung Conduite de véhicule Conduite de véhicule Operation Operation ...
Страница 217: ...S05D S06D S05D S06D Wartung Wartung Entretien Entretien Maintenance Maintenance ...
Страница 261: ...S05D S06D S05D S06D Störung Ursache und Abhilfe Störung Ursache und Abhilfe ...
Страница 265: ...S05D S06D S05D S06D Dérangements causes et remèdes Dérangements causes et remèdes ...
Страница 269: ...S05D S06D S05D S06D Malfunctions causes and remedies Malfunctions causes and remedies ...
Страница 273: ...Anhang Anhang Appendice Appendice Appendices Appendices ...
Страница 274: ......
Страница 275: ......
Страница 282: ......