1MAC050144-MB C
Section 7
Control functions
615 series ANSI
503
Technical Manual
Figure 272:
Simplified CBB initiation diagram
INIT_1... 6
initiation lines
CBB1...CBB2
first two cycle building blocks
The operation of a CBB consists of two parts: initiation and execution. In the initiation
part, the status of the initiation lines is compared to the CBB settings. In order to allow the
initiation at any of the initiation line activation, the corresponding switch in the
Init signals
CBB_
parameter must be set to TRUE. In order to block the initiation, the corresponding
switch in the
Blk signals CBB_
parameter must be set to TRUE.
If any of the initiation lines set with the
Init signals CBB_
parameter is active and no
initiation line causes blocking, the CBB requests for execution.
Содержание 615 Series ANSI
Страница 1: ...Relion Protection and Control 615 series ANSI Technical Manual ...
Страница 2: ......
Страница 29: ...1MAC050144 MB C Section 615 series ANSI 22 Technical Manual ...
Страница 389: ...Section 4 1MAC050144 MB C Protection functions 382 615 series ANSI Technical Manual ...
Страница 485: ...Section 6 1MAC050144 MB C Supervision functions 478 615 series ANSI Technical Manual ...
Страница 635: ...Section 10 1MAC050144 MB C Other functions 628 615 series ANSI Technical Manual ...
Страница 707: ...Section 15 1MAC050144 MB C Applicable standards and regulations 700 615 series ANSI Technical Manual ...
Страница 711: ...Section 16 1MAC050144 MB C Glossary 704 615 series ANSI Technical Manual ...
Страница 712: ......