Chapter 4 - 38 Liter Bubbler Installation
_______________________________________________________________________________________________________________
MNL000625.doc
Revision 0
06/25/2019
Chemical Equipment
© Versum Materials US, LLC. as of the revision and date shown. All rights reserved.
Confidential and Proprietary Data
Page 4
-
1
Versum Materials Confidential
Chapter 4
38 Liter Bubbler Installation
Section 1
38 Liter Bubbler Installation
Section 2
Bubbler Valves
Section 3
Installation of the Bubbler and Valves
Section 4
Bubbler and System Leak test - Setup
Section 5
Leak Test
– main Manifold -> Pressure Decay
Section 6
Leak Test
– Vapor Out -> Pressure Decay
Section 7 Leak Test
– Sample Out/Purge Line -> Pressure Decay
Section 8
Leak Test
– 38L Bubbler/Outer Cooling Jacket ->
Pressure Decay
Section 9
Leak Test
– External Refill Line -> Pressure Decay
Section 10
System Purge
Section 11
Install Bubbler Chiller Connections
Section 12
Entering Bubbler Liquid Weight