Chapter 2 - Site Preparation
MNL000623.doc
Revision 0
06/25/2019
Chemical Equipment
© Versum Materials US, LLC. as of the revision and date shown. All rights reserved.
Confidential and Proprietary Data
Page 2
-
4
Versum Materials Confidential
Figure 2-1:
Earthquake Bolt-Down Pattern with Front Door Clearances
2.2 Facility Requirements
When selecting a location for the unit, ensure that the following facilities are
available to make connections on top of the cabinet.
•
Environmental
•
Electrical
•
Supply gases
•
Venturi Vacuum
Supply
•
Exhaust and Vent
•
Chemical Delivery Line
•
Bulk Chemical Refill Line (from
BCD200, CG010 or CG310)
•
Chemical Outlet