Chapter 6
– System Operation
MNL000627
Revision 0
06/25/2019
Chemical Equipment
© Versum Materials US, LLC. as of the revision and date shown. All rights reserved.
Confidential and Proprietary Data
Page 6
-
13
Versum Materials Confidential
To start Bubbler Line Purge operation:
1. Select CHEM ON from the pull-down menu of
the Main Menu and click
Start PRC PURGE
.
The Controller status box for Bubbler CHEM
ON will change to PRC PURGE, in blue
2. Once PRC PURGE operation is started, the
Stop PRC PURGE button will be enabled on
the CHEM ON Main Menu. Click Stop PRC
PURGE at any time to Bubbler Line Purge
operation
3. Bubbler Line Purge operation can be started
unless there is a shutdown alarm present in
the cabinet