Chapter 1 - Delivery and Inspection
_______________________________________________________________________________________________________________
MNL000622.doc
Revision 0
6/17/2019
Chemical Equipment
© Versum Materials US, LLC. as of the revision and date shown. All rights reserved.
Confidential and Proprietary Data
Page
1
-
2
Versum Materials Confidential
Chapter 1: Delivery and Inspection
1.1 Delivery
The ChemGuard® Gen III may be shipped in multiple packing boxes. The packing slip on the
outside of one of the cartons indicates the number of items in the order. A separate Shipping
Identification Sheet (SIS), or packing checklist, included with the manuals, identifies all
components in the shipment. Before unpacking, make sure your order includes the correct
number of packages.
This shipment includes one empty bubbler chemical container. You will need to order a
container or containers containing chemical. The contents of the packing boxes are:
•
The ChemGuard
®
Gen III Cabinet
•
One (1) empty bubbler chemical container
•
Start-up kit (See Packing Checklist included with shipment)
•
Shipping Identification Sheet (packing checklist)
•
ChemGuard
®
Gen III Quality Inspection Records
NOTE:
Save all cartons (along with foam supports and padding) for re-use in
case unit must be returned to Versum Materials, Inc.
1.2 Inspection
Be sure each item on the packing checklist is included in the shipment. Notify Versum
Materials, Inc. within 30 days if anything is missing. A
fter 30 days, it is the customer’s
responsibility to purchase missing or damaged parts.
1. Verify that the part numbers on the items are the same as specified on the Shipping
Identification Sheet (SIS).
2. Keep the packing checklist for use in any future communication with Versum Materials,
Inc. Customer Service.