Chapter 7 - Maintenance and Calibration Procedures
_______________________________________________________________________________________________________________
MNL000628.doc
Revision 0
06/25/2019
Chemical Equipment
© Versum Materials US, LLC. as of the revision and date shown. All rights reserved.
Confidential and Proprietary Data
Page 7
-
3
Versum Materials Confidential
7.2.1 Power Supply Verification
1. Select the lower task bar
at bottom of the display
screen
2. System information
screen will be displayed.
Select the top tab on the
far right labeled “Status”
3. While monitoring Carrier
> 24V, adjust Power
Supply 1 or 2 for 24V ± .2
vdc
4. When Dual Power Supply option
used turn power off at Power
Supply 2 to adjust Power Supply 1
5. Turn power off at Power Supply 1
to adjust Power Supply 2
6.
Turn both Power Supply’s on