Chapter 4 - 38 Liter Bubbler Installation
_______________________________________________________________________________________________________________
MNL000625.doc
Revision 0
06/25/2019
Chemical Equipment
© Versum Materials US, LLC. as of the revision and date shown. All rights reserved.
Confidential and Proprietary Data
Page 4
-
7
Versum Materials Confidential
Note: Confirm vapor output line from V11 is connected and is closed at tool.
3. Wait 15 minutes and then close V1.
4. Place Manual Mode in Secure Mode.
5. Wait 30 minutes.
6. Return to System Test -> Test Analog In. Compare PT1 pressure from values
recorded in Leak Check Setup, above. Confirm change in pressure (Pressure decay)
is less than 1psig, 0.2mA.
____________PSIG ___________ mA
Note, if pressure drop is greater than specified, troubleshoot until pressure decay
meets this specification.
7. Cancel out of Manual Mode.
4.7
Leak Test
– Sample Out/Purge Line -> Pressure Decay
1. Confirm/Close MV1, MV15.
2. Open MV10.
3. Enter Manual Mode, open V4, V1, V6 and V3.
Note: Confirm Sample Out/Purge line from MV10 is connected and is closed at tool.
4. Wait 15 minutes and then close V1.
5. Place Manual Mode in Secure Mode.
6. Wait 30 minutes.
7. Return to System Test -> Test Analog In. Compare PT1 pressure from values
recorded in Leak Check Setup, above. Confirm change in pressure (Pressure decay)
is less than 1psig, 0.2mA.
____________PSIG ___________mA
Note, if pressure drop is greater than specified, troubleshoot until pressure decay
meets this specification.
8. Cancel out of Manual Mode.
4.8
Leak Test
– 38 Liter Bubbler/Outer Cooling Jacket -> Pressure Decay
Note, Chiller Connections to the outer coolant jacket not installed at this time
1. Confirm Chiller Connections to the outer coolant jacket not connected and ports open
to atmosphere
2. From the Main Menu, enter Config Menu -> System Setup -> and select Disable Valve
Locks.
3. Confirm/Close MV1, MV10, MV15.