37
Nynja Build Manual 1.4d
a) Where the rear cabin frame cross-tube
SKR40
crosses the rear cabin frame
diagonals
SKR27
they should be connected with a bolt, pointing backwards.
UK MOD
– the holes will need drilling out to 6mm. Suitable 6mm bolts
are included with the wooden spreader bar pieces.
b) Paint the wooden tank spreader pieces with fuel-proof paint.
Fuel proof paint is available from model aircraft shops, an enjoyable but
potentially expensive visit!
c) Assemble the wooden fuel tank load spreading pieces on the rear end of
these bolts and tighten, but do not crush the wood excessively.
Ensure that the end of the bolt is below the level of the rear surface of
the wooden pieces. Long side faces outwards
Figure 32 fuel tank wooden tank spreader pieces.
2.7 Engine Supports
2.7.1 Rotax 912.
Figure 33 Rotax 912 engine mounts
Summary of Contents for Nynja
Page 1: ...1 Nynja Build Manual 1 4d Nynja Build manual Version 1 4d...
Page 2: ...2 Nynja Build Manual 1 4d Figure 1 tube numbering scheme...
Page 3: ...3 Nynja Build Manual 1 4d Figure 2 Basic frame Skyranger...
Page 4: ...4 Nynja Build Manual 1 4d Figure 3 uncovered Skyranger frame...
Page 60: ...60 Nynja Build Manual 1 4d Figures 65 cable arrangement further overview...
Page 187: ...187 Nynja Build Manual 1 4d Figure 254 heavy duty power wiring schematic Rotax 912...
Page 188: ...188 Nynja Build Manual 1 4d Figure 255 low current wiring schematic Rotax 912...
Page 189: ...189 Nynja Build Manual 1 4d Figure 256 instrument wiring schematic Rotax 912...
Page 207: ...207 Nynja Build manual 1 4d 18 2 One Piece Door Figure 282 one piece door frame...
Page 269: ...269 Nynja Build manual 1 4d...
Page 270: ...270 Nynja Build manual 1 4d 27 2 Wire locking...
Page 271: ...271 Nynja Build manual 1 4d...
Page 272: ...272 Nynja Build manual 1 4d...
Page 273: ...273 Nynja Build manual 1 4d...