Nynja Build Manual 1.4d
b) Apply threadlock and tighten the bolts holding the trailing edge U-brackets, as
they are not easily accessible later, but not so tight as to prevent easy rotation
of the fittings by hand pressure.
2.5.2 Fitting the rear cabin uprights.
Refer to figure 27
a) Assemble the rear cabin uprights
SKR6
to the main undercarriage cross-beam
SKR9
, using the second set of holes from the end.
Remember the bolt spacers on the two bolts at the bottom of
SKR6
.
The bolts should all point rearwards through the main undercarriage
cross-beam
SKR6
.
b) Lift the upper triangle into position on the rear cabin uprights
SKR6
and
temporarily secure with an 8mm diameter bolt.
c) Secure the bolts through the rear cabin uprights
SKR6
and the upper cabin
triangle tubes
SKR10
including the proper spacers etc..
This is easier now the upper cabin triangle is in place, although it is still
worth leaving all the accessible bolts loose until more of the fuselage is
assembled.
The 8mm bolts securing the rear cabin uprights
SKR6
are fitted with
spacers and the nut must not be done up yet as there are more pieces
to fit to it.
2.6 Rear cabin frame bracing.
Figure 28 lower and upper ends of rear cabin frame diagonals.
a) Bolts and fittings for the SKR9 tube are packaged separately
– in a bag
marked ‘9’, Find these now.
b) Assemble the steel end pieces into the rear cabin frame diagonals
SKR27
.
The one with the 8mm hole goes at the upper end and the one with the
6mm hole goes at the lower end.
Summary of Contents for Nynja
Page 1: ...1 Nynja Build Manual 1 4d Nynja Build manual Version 1 4d...
Page 2: ...2 Nynja Build Manual 1 4d Figure 1 tube numbering scheme...
Page 3: ...3 Nynja Build Manual 1 4d Figure 2 Basic frame Skyranger...
Page 4: ...4 Nynja Build Manual 1 4d Figure 3 uncovered Skyranger frame...
Page 60: ...60 Nynja Build Manual 1 4d Figures 65 cable arrangement further overview...
Page 187: ...187 Nynja Build Manual 1 4d Figure 254 heavy duty power wiring schematic Rotax 912...
Page 188: ...188 Nynja Build Manual 1 4d Figure 255 low current wiring schematic Rotax 912...
Page 189: ...189 Nynja Build Manual 1 4d Figure 256 instrument wiring schematic Rotax 912...
Page 207: ...207 Nynja Build manual 1 4d 18 2 One Piece Door Figure 282 one piece door frame...
Page 269: ...269 Nynja Build manual 1 4d...
Page 270: ...270 Nynja Build manual 1 4d 27 2 Wire locking...
Page 271: ...271 Nynja Build manual 1 4d...
Page 272: ...272 Nynja Build manual 1 4d...
Page 273: ...273 Nynja Build manual 1 4d...