248
Nynja Build manual 1.4d
24.3 Wing Root Fairings
Figure 349 wing root fairings
Use the 4x10mm white plastic pan head screws to secure these.
7 screws evenly spaced should be sufficient. Make sure the outermost
on the top is not drilled too close to the wing root batten where the nut
might foul it.
For best effect against the tinted screen viewed from the inside, we
painted the inside of the fairings black, and use the black domed
headed nuts
24.4 Cable Exit Fairings
Figure 350 Cable exit fairings
Make sure cable exit holes are generous, then fix fairings with the white
4x10mm plastic panhead screws.
Summary of Contents for Nynja
Page 1: ...1 Nynja Build Manual 1 4d Nynja Build manual Version 1 4d...
Page 2: ...2 Nynja Build Manual 1 4d Figure 1 tube numbering scheme...
Page 3: ...3 Nynja Build Manual 1 4d Figure 2 Basic frame Skyranger...
Page 4: ...4 Nynja Build Manual 1 4d Figure 3 uncovered Skyranger frame...
Page 60: ...60 Nynja Build Manual 1 4d Figures 65 cable arrangement further overview...
Page 187: ...187 Nynja Build Manual 1 4d Figure 254 heavy duty power wiring schematic Rotax 912...
Page 188: ...188 Nynja Build Manual 1 4d Figure 255 low current wiring schematic Rotax 912...
Page 189: ...189 Nynja Build Manual 1 4d Figure 256 instrument wiring schematic Rotax 912...
Page 207: ...207 Nynja Build manual 1 4d 18 2 One Piece Door Figure 282 one piece door frame...
Page 269: ...269 Nynja Build manual 1 4d...
Page 270: ...270 Nynja Build manual 1 4d 27 2 Wire locking...
Page 271: ...271 Nynja Build manual 1 4d...
Page 272: ...272 Nynja Build manual 1 4d...
Page 273: ...273 Nynja Build manual 1 4d...