Nynja Build Manual 1.4d
f) Measure the positions of the
SKR34
tubes relative to the centre of the aircraft
to verify they are still at 900mm
g) Mark the positions for the heat-shrink rings to centre them on the
SKR34
tubes.
h) Remove the wings, and heat-shrink the rings into position.
i) Secure the
SKR34
tubes at the same positions they held whilst the wing was
fitted.
These can be held in place simply by a tube, such as a piece of plastic
drainpipe or similar
and cable ties / tape. Or a more ‘engineered’
system using aluminium tube and brackets. The aim is to securely
locate the tubes.
Figure 175 measuring and holding the frame in position.
Summary of Contents for Nynja
Page 1: ...1 Nynja Build Manual 1 4d Nynja Build manual Version 1 4d...
Page 2: ...2 Nynja Build Manual 1 4d Figure 1 tube numbering scheme...
Page 3: ...3 Nynja Build Manual 1 4d Figure 2 Basic frame Skyranger...
Page 4: ...4 Nynja Build Manual 1 4d Figure 3 uncovered Skyranger frame...
Page 60: ...60 Nynja Build Manual 1 4d Figures 65 cable arrangement further overview...
Page 187: ...187 Nynja Build Manual 1 4d Figure 254 heavy duty power wiring schematic Rotax 912...
Page 188: ...188 Nynja Build Manual 1 4d Figure 255 low current wiring schematic Rotax 912...
Page 189: ...189 Nynja Build Manual 1 4d Figure 256 instrument wiring schematic Rotax 912...
Page 207: ...207 Nynja Build manual 1 4d 18 2 One Piece Door Figure 282 one piece door frame...
Page 269: ...269 Nynja Build manual 1 4d...
Page 270: ...270 Nynja Build manual 1 4d 27 2 Wire locking...
Page 271: ...271 Nynja Build manual 1 4d...
Page 272: ...272 Nynja Build manual 1 4d...
Page 273: ...273 Nynja Build manual 1 4d...