101
Nynja Build Manual 1.4d
6.2 Fitting the rear fuselage fairings
a) Prepare the fuselage longerons by covering the outside edges where the
fairings will touch with clear tape
– clear packaging tape is enough and will
help prevent any damage from slight movement and abrasion in service. Also
smooth and small lumps or sharp shards from the inside of the corners of the
fairings with 80 grit or similar sandpaper.
b) It is very important the following sequence for fitting is followed otherwise the
fairings can be damaged:
Fit the starboard (right) fairing first. Fit at an angle so that the lower
edge is put in position first. Make sure the bolt from the central bracing
frame fits in the hole in the fairing.
Then rotate so the upper edge ‘clips’ over the upper fuselage longeron.
Fit the portside in the same manner taking care to overlap the starboard
fairing on the joins.
Figure 117 fitting the rear fairings in position.
Summary of Contents for Nynja
Page 1: ...1 Nynja Build Manual 1 4d Nynja Build manual Version 1 4d...
Page 2: ...2 Nynja Build Manual 1 4d Figure 1 tube numbering scheme...
Page 3: ...3 Nynja Build Manual 1 4d Figure 2 Basic frame Skyranger...
Page 4: ...4 Nynja Build Manual 1 4d Figure 3 uncovered Skyranger frame...
Page 60: ...60 Nynja Build Manual 1 4d Figures 65 cable arrangement further overview...
Page 187: ...187 Nynja Build Manual 1 4d Figure 254 heavy duty power wiring schematic Rotax 912...
Page 188: ...188 Nynja Build Manual 1 4d Figure 255 low current wiring schematic Rotax 912...
Page 189: ...189 Nynja Build Manual 1 4d Figure 256 instrument wiring schematic Rotax 912...
Page 207: ...207 Nynja Build manual 1 4d 18 2 One Piece Door Figure 282 one piece door frame...
Page 269: ...269 Nynja Build manual 1 4d...
Page 270: ...270 Nynja Build manual 1 4d 27 2 Wire locking...
Page 271: ...271 Nynja Build manual 1 4d...
Page 272: ...272 Nynja Build manual 1 4d...
Page 273: ...273 Nynja Build manual 1 4d...