267
Nynja Build manual 1.4d
A windsock and fire extinguisher on site are essential items. A device for measuring
windspeed is desirable.
Some of the test flying will be involved with sorting out a few final adjustments, so
make sure you take to the field the following items:
The +5mm lift strut end (the extra one lying at the bottom of your pile of
leftover parts!).
Lockwire, lockwire pliers and side-cutter pliers.
General tools (Screwdrivers, spanners etc.)
Propeller pitch setting tool
Fuel, in cans to allow choice of fuel load to vary CG position
Some spare hardware
– split pins, nyloc nuts etc.
All 450kg of associated paperwork!
Refer back to section 1.2 for more information on the paperwork and test flying
procedure.
And finally,
don’t forget your camera to record the moment!
Happy Flying!
Summary of Contents for Nynja
Page 1: ...1 Nynja Build Manual 1 4d Nynja Build manual Version 1 4d...
Page 2: ...2 Nynja Build Manual 1 4d Figure 1 tube numbering scheme...
Page 3: ...3 Nynja Build Manual 1 4d Figure 2 Basic frame Skyranger...
Page 4: ...4 Nynja Build Manual 1 4d Figure 3 uncovered Skyranger frame...
Page 60: ...60 Nynja Build Manual 1 4d Figures 65 cable arrangement further overview...
Page 187: ...187 Nynja Build Manual 1 4d Figure 254 heavy duty power wiring schematic Rotax 912...
Page 188: ...188 Nynja Build Manual 1 4d Figure 255 low current wiring schematic Rotax 912...
Page 189: ...189 Nynja Build Manual 1 4d Figure 256 instrument wiring schematic Rotax 912...
Page 207: ...207 Nynja Build manual 1 4d 18 2 One Piece Door Figure 282 one piece door frame...
Page 269: ...269 Nynja Build manual 1 4d...
Page 270: ...270 Nynja Build manual 1 4d 27 2 Wire locking...
Page 271: ...271 Nynja Build manual 1 4d...
Page 272: ...272 Nynja Build manual 1 4d...
Page 273: ...273 Nynja Build manual 1 4d...