103
Nynja Build Manual 1.4d
Figure 120 fitting at rear against finpost
e) When correct positioning has been verified a 4mm hole can be drilled each
side in the rear of the upper fuselage longeron in the position shown below
and a 4mm / 5/32 cleco or skinpin (Light Aerospares - LAS sell them) inserted
to hold the fairings in the correct fore and aft position. This will stop the fairings
from sliding rearwards when final strapping tension is applied. A rivet will be
put in this hole later after all other fixings are done.
Figure 121 positioning hole
f) The staps can now be tensioned until all the top and bottom seams align.
When a final verification of alignment has been made you can now start
drilling the fixing holes.
Strips of packaging tape pulled tight across the join can also be used to
help draw the fairings together.
Start first by drilling an upper and lower hole to fix the fairings on to the
finpost. Make sure the halves are tightly together when you do this.
Stretching some packing tape across between the two may help to pull
them together for final fit.
Summary of Contents for Nynja
Page 1: ...1 Nynja Build Manual 1 4d Nynja Build manual Version 1 4d...
Page 2: ...2 Nynja Build Manual 1 4d Figure 1 tube numbering scheme...
Page 3: ...3 Nynja Build Manual 1 4d Figure 2 Basic frame Skyranger...
Page 4: ...4 Nynja Build Manual 1 4d Figure 3 uncovered Skyranger frame...
Page 60: ...60 Nynja Build Manual 1 4d Figures 65 cable arrangement further overview...
Page 187: ...187 Nynja Build Manual 1 4d Figure 254 heavy duty power wiring schematic Rotax 912...
Page 188: ...188 Nynja Build Manual 1 4d Figure 255 low current wiring schematic Rotax 912...
Page 189: ...189 Nynja Build Manual 1 4d Figure 256 instrument wiring schematic Rotax 912...
Page 207: ...207 Nynja Build manual 1 4d 18 2 One Piece Door Figure 282 one piece door frame...
Page 269: ...269 Nynja Build manual 1 4d...
Page 270: ...270 Nynja Build manual 1 4d 27 2 Wire locking...
Page 271: ...271 Nynja Build manual 1 4d...
Page 272: ...272 Nynja Build manual 1 4d...
Page 273: ...273 Nynja Build manual 1 4d...