120
Nynja Build Manual 1.4d
e) If the aileron movement feels at all stiff, the holes for the eyebolts on the
trailing edge may need to be eased slightly to achieve good alignment and
thus easy movement. Once satisfied tighten the eyebolts, remembering the
Loctite, and do not over-tighten (as a guide they should still be able to turn
with only moderate finger pressure).
f) Burn a small hole in the fabric at the trailing edge through the 4mm hole at the
rear of the brace.
g) Burn a hole in the same position on the upper surface fabric.
h) Remove the aileron from the wing.
i) Insert a 4mm bolt to hold the angle in position and using the angle as a guide
burn a slot 60mm long on the under surface measured from the centre of the
leading edge spar, Figure 145.
j) Use the long brace from the opposite aileron against the upper surface as a
guide to melt the upper slot.
This slot should be 50mm long measured from the centre of the leading
edge spar.
Figure 145 slot for the aileron horn in the undersurface of the aileron,
k) Put the braces back in their correct positions and secure the trailing edge with
a 4mm bolt passing through the thin sheet aluminium U-piece, the spacer tube
and the lower brace, the sequence shown in Figure 143.
Note that the U-piece edges should be bent up slightly so that the edge
does not cut the fabric over time.
l) Tighten this assembly, and also tighten the 6mm bolt holding the front of the
top and bottom braces.
m) Insert the aileron horn.
If it is a tight fit through the fabric you may have to lengthen the slots a
little.
n) Check the alignment of the rivet holes.
These may have to be gently eased with a 4mm drill or reamer.
o) Insert all rivets, from the horn side, to ensure they all fit, then pull up the rivets.
Summary of Contents for Nynja
Page 1: ...1 Nynja Build Manual 1 4d Nynja Build manual Version 1 4d...
Page 2: ...2 Nynja Build Manual 1 4d Figure 1 tube numbering scheme...
Page 3: ...3 Nynja Build Manual 1 4d Figure 2 Basic frame Skyranger...
Page 4: ...4 Nynja Build Manual 1 4d Figure 3 uncovered Skyranger frame...
Page 60: ...60 Nynja Build Manual 1 4d Figures 65 cable arrangement further overview...
Page 187: ...187 Nynja Build Manual 1 4d Figure 254 heavy duty power wiring schematic Rotax 912...
Page 188: ...188 Nynja Build Manual 1 4d Figure 255 low current wiring schematic Rotax 912...
Page 189: ...189 Nynja Build Manual 1 4d Figure 256 instrument wiring schematic Rotax 912...
Page 207: ...207 Nynja Build manual 1 4d 18 2 One Piece Door Figure 282 one piece door frame...
Page 269: ...269 Nynja Build manual 1 4d...
Page 270: ...270 Nynja Build manual 1 4d 27 2 Wire locking...
Page 271: ...271 Nynja Build manual 1 4d...
Page 272: ...272 Nynja Build manual 1 4d...
Page 273: ...273 Nynja Build manual 1 4d...