![Skyranger Nynja Build Manual Download Page 216](http://html1.mh-extra.com/html/skyranger/nynja/nynja_build-manual_1291237216.webp)
216
Nynja Build manual 1.4d
i) Now fit the lower door frame together.
Start with fixing the top tube to the hinge by drilling and fixing with a
cleco/ skinpin. Ensure that the tube is correctly orientated with bend
outwards and not rotated upwards or downwards.
Next with the door frame taped in the closed position,drill and rivet the
rear gusset plate into position. Allow room to fit the catch, and but up
against the catch plate later later
– see Fig 262 above and Fig 272
later. Use 4mm aluminium rivets. Make sure the doorframes are not
allowed to twist during this operation
j) Un-tape and check correct fit and opening and closing.
Some adjustment by carefully bending the tubes may be required.
Leave the clecos in position holding the tubes to the hinge for now.
They are not riveted to the hinge until the lexan is fitted.
18.3.2
Upper door frames
a) The door is hinged with twp short lengths of aluminium hinge. These are
attached to a 20x20mm piece of aluminium angle. This angle has its upper
horizontal edge facing outwards, at the same level as the wing undersurface
Figure 296 upper door
b) Offer up the 20x20 angle and align its top edge level with the wing
undersurface. Mark the position of the tube centres for TU34 and TU 6, then
drill the centre of the angle in these positions
– 4mm diameter in TU34 and
5mm in TU6.
c) Offer it up again, mark and drill the TU34 and TU6 to match, and temporarily
fix into position and verify fit, then remove.
d) Attach the hinges.
Summary of Contents for Nynja
Page 1: ...1 Nynja Build Manual 1 4d Nynja Build manual Version 1 4d...
Page 2: ...2 Nynja Build Manual 1 4d Figure 1 tube numbering scheme...
Page 3: ...3 Nynja Build Manual 1 4d Figure 2 Basic frame Skyranger...
Page 4: ...4 Nynja Build Manual 1 4d Figure 3 uncovered Skyranger frame...
Page 60: ...60 Nynja Build Manual 1 4d Figures 65 cable arrangement further overview...
Page 187: ...187 Nynja Build Manual 1 4d Figure 254 heavy duty power wiring schematic Rotax 912...
Page 188: ...188 Nynja Build Manual 1 4d Figure 255 low current wiring schematic Rotax 912...
Page 189: ...189 Nynja Build Manual 1 4d Figure 256 instrument wiring schematic Rotax 912...
Page 207: ...207 Nynja Build manual 1 4d 18 2 One Piece Door Figure 282 one piece door frame...
Page 269: ...269 Nynja Build manual 1 4d...
Page 270: ...270 Nynja Build manual 1 4d 27 2 Wire locking...
Page 271: ...271 Nynja Build manual 1 4d...
Page 272: ...272 Nynja Build manual 1 4d...
Page 273: ...273 Nynja Build manual 1 4d...