Figure 364 Rear and front upper fittings.
Figure 365 Upper fixing hardware. Note position of rubber grommet
28.3 General checks
a) Check that all nuts and bolts are properly tightened and threadlocked.
b) Check that all bolts subject to rotation in use are correctly split-pinned.
c) Check that all electrical connections are properly made, with no risk of short-
circuiting.
d) Check that all fuel, oil, and water pipe clips and other connections are properly
tightened and sealed.
28.4 Baggage Bag
a) Remove the plywood base from the baggage bag, and cut a generous notch
out of the corner to clear the fuel filler fitting
b) Loop the rear securing straps around the base of the rear fuselage bracing
frame at its lower corners, with the buckle towards the fuel tanks.
The strap should loop around the back of all the tubes.
Summary of Contents for Nynja
Page 1: ...1 Nynja Build Manual 1 4d Nynja Build manual Version 1 4d...
Page 2: ...2 Nynja Build Manual 1 4d Figure 1 tube numbering scheme...
Page 3: ...3 Nynja Build Manual 1 4d Figure 2 Basic frame Skyranger...
Page 4: ...4 Nynja Build Manual 1 4d Figure 3 uncovered Skyranger frame...
Page 60: ...60 Nynja Build Manual 1 4d Figures 65 cable arrangement further overview...
Page 187: ...187 Nynja Build Manual 1 4d Figure 254 heavy duty power wiring schematic Rotax 912...
Page 188: ...188 Nynja Build Manual 1 4d Figure 255 low current wiring schematic Rotax 912...
Page 189: ...189 Nynja Build Manual 1 4d Figure 256 instrument wiring schematic Rotax 912...
Page 207: ...207 Nynja Build manual 1 4d 18 2 One Piece Door Figure 282 one piece door frame...
Page 269: ...269 Nynja Build manual 1 4d...
Page 270: ...270 Nynja Build manual 1 4d 27 2 Wire locking...
Page 271: ...271 Nynja Build manual 1 4d...
Page 272: ...272 Nynja Build manual 1 4d...
Page 273: ...273 Nynja Build manual 1 4d...