146
Nynja Build Manual 1.4d
Figure 180 Arm should align with vertical part of throttle handle
j) Bolt the arm into position using the 6mm bolt and 6-22 saddle washer between
arm and torque tube.
k) Refit the torque tube onto the mounting plates
l) Rivet the plates into position to the cabin uprights
tu34
, using 4mm steel
rivets.
m) Adjust the throttle friction by tightening the lock nuts on the port side torque-
tube spindle.
The starboard side should be done up just enough to remove any play.
n) Once the friction has been set, lock the two friction nuts together at both ends.
o) Check that the spacing and centralisation of the parts holding the tops of the
cabin uprights has not been disturbed by the fitment of the throttles.
Summary of Contents for Nynja
Page 1: ...1 Nynja Build Manual 1 4d Nynja Build manual Version 1 4d...
Page 2: ...2 Nynja Build Manual 1 4d Figure 1 tube numbering scheme...
Page 3: ...3 Nynja Build Manual 1 4d Figure 2 Basic frame Skyranger...
Page 4: ...4 Nynja Build Manual 1 4d Figure 3 uncovered Skyranger frame...
Page 60: ...60 Nynja Build Manual 1 4d Figures 65 cable arrangement further overview...
Page 187: ...187 Nynja Build Manual 1 4d Figure 254 heavy duty power wiring schematic Rotax 912...
Page 188: ...188 Nynja Build Manual 1 4d Figure 255 low current wiring schematic Rotax 912...
Page 189: ...189 Nynja Build Manual 1 4d Figure 256 instrument wiring schematic Rotax 912...
Page 207: ...207 Nynja Build manual 1 4d 18 2 One Piece Door Figure 282 one piece door frame...
Page 269: ...269 Nynja Build manual 1 4d...
Page 270: ...270 Nynja Build manual 1 4d 27 2 Wire locking...
Page 271: ...271 Nynja Build manual 1 4d...
Page 272: ...272 Nynja Build manual 1 4d...
Page 273: ...273 Nynja Build manual 1 4d...