152
Nynja Build Manual 1.4d
the exact position of the cowling screws are determined to ensure even
spacing.
g) Dont trim or fix the scuttle to the door pillars just yet as some final adjustment
will be required to ensure perfect alignment of cowlings and spinner,. Hold it in
position for now with some tape and clamps in the position shown below
Figure 191 scuttle positioning
– dont trim overlap yet, and clamp in position with upper edge
around 500mm from top of door pillar tube (TU34 (note
– some sanding of top edge of scuttle
may be encessary to acheive a symettrical measurement
– and may not be exactly 500mm).
h) Firewall halves can be rivetted in position now (short 4mm bolts can
alternatively be used if desired), and the small closure panels can be rivetted
in position now or left until engine ancillaries are all fitted
– dont forget them!
Figure 192 left - firewall closure panels
– dont forget them! right - sealing
i) Firewall Foam
– this is self adhesive on one side and is fire retardent and
noise dampening. It is applied to the cockpit side of firewall. It can be done at
this early stage or applied near to finish of build. Further sealing grommets can
be fitted if desired as in fig above
– use non flammable material such as
leather etc.
Summary of Contents for Nynja
Page 1: ...1 Nynja Build Manual 1 4d Nynja Build manual Version 1 4d...
Page 2: ...2 Nynja Build Manual 1 4d Figure 1 tube numbering scheme...
Page 3: ...3 Nynja Build Manual 1 4d Figure 2 Basic frame Skyranger...
Page 4: ...4 Nynja Build Manual 1 4d Figure 3 uncovered Skyranger frame...
Page 60: ...60 Nynja Build Manual 1 4d Figures 65 cable arrangement further overview...
Page 187: ...187 Nynja Build Manual 1 4d Figure 254 heavy duty power wiring schematic Rotax 912...
Page 188: ...188 Nynja Build Manual 1 4d Figure 255 low current wiring schematic Rotax 912...
Page 189: ...189 Nynja Build Manual 1 4d Figure 256 instrument wiring schematic Rotax 912...
Page 207: ...207 Nynja Build manual 1 4d 18 2 One Piece Door Figure 282 one piece door frame...
Page 269: ...269 Nynja Build manual 1 4d...
Page 270: ...270 Nynja Build manual 1 4d 27 2 Wire locking...
Page 271: ...271 Nynja Build manual 1 4d...
Page 272: ...272 Nynja Build manual 1 4d...
Page 273: ...273 Nynja Build manual 1 4d...